Category: Vessel/Laboratory Page 69 of 89

First Month Down

Our cruise in Mexico is now over and I have set my legs on land. I spent the last day before entering my dorm on the boat and assissting in several technician projects that needed to be done prior to the following research cruise. The science crew showed up later our first day back and most of the day was spent preparing for their needs on board. More specifically, I worked on preparing our CTD. Our CTD rosette was lost to sea last cruise and now we must employ a much smaller option. There are many sensors mandatory for this trip, even a horizontal niskin bottle that must be rigged to the bottom, so it has been difficult to make room for everything. Nonetheless, my mentor and I successfully rebuilt a whole CTD sensor and pump system. The experience was extremely beneficial for me, as I was not only allowed to switch our sensors, but also rig a complete system from scratch.

After working on the CTD, fixing our weather station attenaes aboard our mast, and supplying an extra hand on deck, I made my way back to my dorm. While it was sad to see the vessel leave, I am excited to enhance my technician and boating skills in a new environment.

My first few days back on land I worked with our small boat manager, Carl, for the remaining of the week learning about boat fueling, repair and maintenance. I will also be helping with the environmental monitoring systems as well towards the end of the week. My first day back was slow and I mostly shadowed Carl around the ship yard fixing small boats. I spent the remainder of my time driving and preparing our pontoon boat, as I will be captaining an education class come Monday. Prior to my time on docks, I have never driven a pontoon boat- but the same general rules of small boating apply. The pontoon boat uses a two-stroke engine and I spent the day driving around the bayou in preparation for Monday. The bayou area is very low and tidal influxes are small in range- unlike up North where you can see a ten-foot change within only a few hours. With this in mind, I went through the bayou for a while with Carl to get a feel for new landmarks and areas of precaution, such as oyster beds. It is a tricky area and you have to constantly pull your engine up to prevent from sucking in mud. Luckily, mud is not as damaging to an engine as sand and you can easily clean your engine out with flexible wire while driving, if your “piss” hole becomes clogged. Attached below is a very smiley picture of me driving my first pontoon boat!

Pontoon trip:

My class arrived around 8:45, which gave me time to set the boat up in the morning, start my engine, prep my ropes and prepare my life jackets. There were several educators on board, which made captaining much easier as I could just focus on driving. I gave a quick safety brief in the beginning and then drove them over to a marsh platform for sampling. Essentially, I edged the top of my boat unto the marsh in neutral, so we can sit around for a while without drifting or floating away. Around noon, the class was ready to return and I used a boat hook to push us away from the marsh and slowly backed up without churning up mud in the very shallow areas. All in all, it was a successful trip. I spent the remainder of the day helping out Carl.

I spent the remaining of my time this week running a few day trips on our research vessel the R/V Acadiana- which is much smaller than the Pelican but is a very capable vessel. Before our trip, we added in new windows, new navigation systems, new tile and a new captain’s chair and counsel. The task was lengthy but we are all prepared for tomorrow. We are set to leave around 7 am with a class and plan to go around the Gulf of Mexico (a very short drive from LUMCON) and spend the day doing mud coring- a memo I did not receive when I showed up in my brand new sneakers- lesson learned.

R/V Acadiana Trip

I met with our deck hand and other tech at the boat around 6:30 am to prep for our morning departure. I spent the morning cleaning windows, starting the boat engines up and removing the boat from shoreline power. It took a few hours to get to our first station, which gave me a great opportunity to drive to our location. The Acadiana does not have auto-pilot yet, so I manually drove the boat- which is far trickier than the Pelican because the steering is very sensitive and deviates from your position, so you must constantly turn your lever back and fourth to keep a straight course. Throughout the day, we did about 50 or more mud cores and around 4:30, headed back to make it to the docks around 7:30 pm. I spent the evening cleaning off the boat, which was covered in mud, and turning the rest of our switches off. It was nice to drive another research vessel, as every vessel steers and drives differently.

Attached below is a picture of the R/V Acadiana.

 

 

A story of Southern hospitality at its finest: During this week we had a very large storm which made many food places closed. Our chef was out for the week and it was hard for me to find good food. Our security guard Kenneth, an older guard at Lumcon, caught a surplus of fish for me, taught me how to fillet them (it was my very first time) and fried them with me for several nights in a row! He even made me beignets, brownies and brought me several other snacks and goodies throughout the week. I have never met Kenneth, but we treated me like family and I will be eternally grateful for his kindness- and even the gut I grew during my time! I posted a pictur below of a sunset we saw while fishing and a set of my first filleted fish. Enjoy!

Mexico, Storms and Drones

Well, it can’t be all fun and games- after returning from New Orleans we were back to the wire preparing for our Mexico cruise, and this time, my passport finally got put to use! The Gulf of Mexico is off the coast of Louisiana and while we do explore the Gulf, it is not considered Mexican or ‘International Waters.’ However, this cruise we traveled to the Bay of Campeche which is Mexican territory. Before the science party arrived, we spent a majority of our time adding the rest of our sensors to the CTD on our back deck. Every cruise involves different sensors, dependent on the scientists needs, and this cruise involved two aquatracka sensors and a CDOM sensor- which measures the “colored dissolved organic matter” within the water. Once the chief scientist arrived, we were able to add the last aquatrack sensor and finish wiring our c-cable with zip ties. Adding sensors to the bottom of the CTD is a lengthy process- especially considering that some may have to be moved around to fit all your necessary needs. It’s like the age long game of Tetris! We use hose clamps to rig the sensors to the bottom rosette platforms, then a cable plug (matching with the sensor) is run to the other end (channel) of the rosette pump. The cable prongs needs to be cleaned with contact cleaner, canned air and then silicon is added for extra lubrication and hold.

Due to the need of a 24 niskin bottle rossette- which is much large than a regular 12 bottle- it was neccessary to deploy our CTD off the back a-frame using our Dynacon Winch. Deployment off the back deck involves a process called tag-lining. Tag-lining is a simple- yet sometimes hard to maneuver- task that involves wrapping ropes on both ends of the rosette and loosely rigging the ropes around our two side cleats on aft deck. While our chief engineer uses our back deck winch to control the CTD, two people hold tightly onto the taglines and maneuver the CTD into the water as smoothly as possible. The tasks involves great tension and pull on the ropes to ensure the CTD does not crash into aft deck during descent. Once the CTD is in the water, two workers quickly pull the rope off the CTD and walk around our winch wire and off aft deck. While tag lining is a simple concept, it is also very dangerous as there are several “pinch points” where the CTD can potentially pin or slide into a worker. Like all things on a vessel, it is very important to always keep a watchful eye and ear for potential hazards. While bringing the CTD to surface, we use a hook called –for lack of better word- “a happy hooker”, which can be used to attach rope on both sides of the CTD to pull up for ascent. Due to the lack of visibility with the aft deck winch, a third worker is needed to signal our chief engineer when the CTD is at surface. During our daily CTD casts and tests, we noticed several anomalies coming from our temperature sensors during up-cast- which consequentially affected our salinity readings as well. After several modifications, we eventually changed out our temperature sensor, channel station and cable to ensure any possible issue was resolved. So far…so good.

Our biggest issue with this cruise was our constant need to terminate our CTD winch wire. Due to deep casts, and the inevitable spinning of our CTD underway- caused by currents, waves, winch spead and boat position, it was a reoccuring issue. We later found the issue of our winch wire, which needed to be replaced, compounded the issue greatly. Our technician and I were up all hours of the night and day terminating. A swivel device can easily fix this issue, but it is expensive and we do not always have all the equipment we need at sea- hence the need to always think on your feet. Terminating a winch wire is a long process (3-4 hours at a descent speed) and involves multiple layers of wire, plastic and internal termination. Despite the stress of constant termination, I learned a lot during the process and am happy for the new skill!

Unfortunately, despite the most valiant efforts, our CTD was lost to Neptune on our last day of sampling. Luckily, 99% of our CTDs were done and we returned in time for a lovely Cyclone- Seriously, someone pissed off the Sea Gods during this cruise. In the end, everyone landed safely and the spanish crew and our crew celebrated our stresses away the following evening on the docks. I am thankful to have met so many interesting, vibrant and unique individuals during the cruise!

Week Two: The Sound of Pelicans and the Smell of New Orleans!

 

 

Hello, All!

It has been a long few weeks, and due to a few technicial errors, it has been longer than I expected since my last post. Boy, can things change overnight!

I will start at the end of my first cruise, and continue with my New Orleans trip to summarize week two:

The ending of my first cruise, in comparision to the beginning, ended very smoothly with only small technical issues caused by wifi- which seems to be a commonly occuring issue in all marine realms. In all honesty, despite how good the wifi network, there is also issues with connection and perhaps one or two overzealous wifi users downloading copicious amounts of data. But, can you blame them? With the crew particiularly in mind, it is natural to want to stay in contact with your loved ones back home. I ended my first cruise on Easter Sunday, where I truly began feeling the effects of what it is like to be a marine technician- that is, a worker bee. We did not arrive back on dock until very late Easter Sunday, as the scientists chose to prolong the cruise because we were ahead of schedule (scientists are too busy to celebrate holidays). It is sad to miss events such as family holidays, or graduation, and a small part of me feels as if I am being robbed of priceless moments, but the experience of being out to sea- with the accompaniment of beautiful sights, smells and sensations- is equally as gratifying and priceless. Last night, a fleet of sea birds and pelicans swarmed the boat during sunset because we were churning up fish. The sight of sea birds, dolphins, sunrises and moonsets, are making this experience well worth the energy I am putting in. Not to mention, the beautiful dinner our chef made to make us all feel at home. The crew truly is a family, and I am honored to have been welcomed into it so gracefully.

Week 1: The Gulf of Mexico and Dolphins!

So, here we are! I boarded the R/V Pelican mid morning, April 5th, after spending the night in Kenner, LA. Upon arrival at the LUMCON facilities, I spent the day meeting the crew and becoming accustomed to the R/V Pelican. Around noon, the crew and I used the a-crane to deploy the vessel’s small boat into the water for a test run, prior to our cruise. The marine technician and I were lucky enough to take the small boat for a test run, but even luckier to find a few pods of dolphins swimming around- A sight I later found is blasé to the crew who always sees them. After performing small boat ops, I helped the crew prepare for the cruise. Our vessel’s freezers were down, so I spent most of the later noon removing old freezers and helping to rig them to the top of the ship to store food and additional science samples. Through early evening to dusk, most of the science Intel had arrived and I spent my remaining time exploring the LUMCON area and facilities. Cruise departure time: 12am

While most of my first day tasks slid onto the backburner, I learned an important lesson: ALWAYS bring seasickness medication, despite whether or not you have been seasick before. Evidently, “sea legs” are earned, and I spent most of the day recovering from illness. Though, I can’t complain about the amazing food on board- it was so good I tasted it going both up and down several times…Despite not feeling up to par, I did my best to complete and learn as many new tasks and instruments as possible. I learned the basics of CTD casts both within the tech lab and on aft deck. After observing and assisting in my first on board CTD cast, I removed the tubing for our sensors and did a clean: triton x, DI, bleach, DI and a good spray down prior. In down time, I perfected my soldering- using the hot glue gun method- and worked on terminating RJ 45 Ethernet cables and rewiring them for practice. After the first day, I began to gain my sea legs, just in time for the chaos that would ensure days latter.

By the third day, we had run into every CTD issue possible-which functioned as a phenomenal learning experience. Overnight, an oxygen sensor imploded under pressure during a deep cast. Due to the incredible variation in depth within and along the Gulf of Mexico, sensors must be changed according to their depth range, prior to casts. This oversight resulted in only one of our two oxygen sensors working. In addition to the oxygen sensor imploding, the firing mechanism within the top carousel of the CTD was not closing all our bottles- an issue resulting from either a “dirty” firing mechanism, or an issue within the internal firing unit of the CTD. Our vessel’s technician and I began by soaking the firing carousel in a detergent bath, a troubleshooting method less time consuming than changing out the internal firing unit. After several soaks of our firing carousel- in addition to replacing the top with a new carousel- the issue persisted later into the evening, which told us there was a potential internal issue- but it is important to follow up with deck tests before committing to a big change. While the firing carousel was soaking I assisted in replacing our missing oxygen sensor with a new one, which worked beautifully. But, of course, it’s never that easy and as one issue plummets, another surely surfaces. During a CTD cast, a scientist removing the sensor tubing broke a small screw holding our sensor in place. The sensor was rigged with zip-ties the first time, and a second time when the same issue occurred with another sensor. Part of my job as a marine technician is to function as a liaison between the crew and science Intel- unfortunately sometimes warnings about equipment are not always followed. We made our way to “jacked-up-city”- which I later learned is a sea name for a set of oilrigs that are clustered together, during periods of non-use. An interesting sight, but we were here to deploy sensors and perform box coring. I assisted in lifting a box core off the back a-frame, using the Appleton crane. After performing box coring, and receiving extra equipment from folks at Lumcon, we performed more boat ops. Using the crane, our small boat was lifted out of the vessel, and into the water. A science member, John and I, drove the boat close to a rig, and deployed an instrument attached to a mooring. The experience was exciting and I couldn’t help but to hum the Hawaii-five-O theme song in my head, as soaring through the Gulf. After some circuit issues were resolved in the tech lab, we called it a day.

After my morning tasks and duties, it was back to the white elephant in the room: our CTD. We began by troubleshooting the CTD with several deck tests- one of which involves an on deck procedure of firing and checking bottles. Through radio, our marine technician and I communicated (one on deck, the other in the technician lab firing bottles) to assure the firing mechanism was working before casting again. It is important to use tubing in both the top and bottom of the bottles before firing- as to assure the bottles do not crack under stress or pressure. Another test involves a very similar firing procedure, but instead of cocking the bottles, a technician places a screwdriver at each magnet of the firing carousel, awaiting a click for confirmation that it fired. After several on deck tests, and a discovery within the internal firing unit, it was confirmed the issues were internal, and the SBE 32 unit did indeed need to be changed. In order to change the SBE 32 unit, several CTD bottles were removed, as well as the top shackle, which involved a sensor being removed and covered in electrical tape for protection. After changing out the unit, several more tests were completed, one more firing mechanism soak, and we were back in business. Due to our long transit time, several lanyards were also replaced.

 During longer transits later in the week, we performed a transmissometer field calibration test. The test includes filing all the CTD rosette bottles with fresh tap water, going through calibration standards within the computer and our manuals, and running an on deck test to assure our values are similar to the calibrated ones. The calibration ran smoothly and I worked on several lanyards for the CTD. Yesterday, we added heat shrink to some stoppers on our lanyards, and while heating accidentally melted away some of our plastic lining. I replaced these, finished my firing mechanism soak and reattached the firing mechanism on my own. During down time throughout the week, I have been shadowing our vessel’s Captain, in the hopes of driving by the end of the trip. I have my USGS 6-Pak License, so learning the rudder mechanisms, boat mechanics, and steering has been incredibly interesting to me and is a goal I plan to pursue throughout my internship. I have been reviewing radar, navnet, AIS, radio station etiquette (if fishermen, rig workers and captains ever actually follow it), along with the basics of throttle, propulsion and steering. An important aspect within the computers, and especially with all the boat traffic and rigs of the Gulf, is CPA- other known as the distance to stay away from boats or rigs that may have line, pipe, etc. hanging around.

All in all, after learning the stresses of being a marine technician, I seized ship and am the new Captain (see below). Just kidding. Disclaimer: auto-pilot is a great way to pretend like you know what you’re doing.

 

Almost on my Way!

 

My name is Amanda Dostie, a recent UConn BS graduate, and a soon to be MATE Intern. With only a number of days left before my departure, I am overwhelmed by a complex variety of emotions. Beyond all else, I am overcome by a deep sense of honor and excitement in beginning this wonderful opportunity. I will start my journey in New Orleans, LA, aboard the R/V Pelican and R/V Point Sur, at the LUMCON facilities. For approximately three months I will learn the ropes of a new world, become accustomed to the life of a marine technician, and in doing so, grow tremendously. Following my time in New Orleans, I will make my way to Bermuda, working alongside BIOS and other institutes.

My journey to where I am now began with my love for the ocean. From a young age, my childhood was enriched with vivid memories along the coastline- swimming, exploring and boating along the waters. Later, my passions lead me to pursue a career within marine science. During my undergraduate career, I immersed myself in a number of academic and personal endeavors surrounding the environment and natural sciences. I took advantage of the research opportunities within my institute, and worked as a research technician for over four years. I worked under several water quality projects studying nutrient pollution, eutrophication, algae blooms, hypoxia, TNT/RDX and other related biochemical interactions. My experience as a research technician exposed me to work aboard large and small vessels. My passion for working in the field, lead me to instruct marine science and other naturalist subjects within outdoor-education. During this time I earned my USGS 6-pak Captains License, and other useful certifications. I finished college deck handing for my institute’s vessels and pursuing personal research endeavors. My personal research endeavors involved algae bloom quantification, remediation, as well as NGO and municipal work, in the hopes of pursuing a business in algae remediation. Upon graduation I was intrigued by the MATE Internship- an exciting opportunity that will utilize and blend my research and mechanical interests. Although I will be extremely out of my element, I am excited to learn as much as I can, especially in fixing instruments!

I am spending my remaining days with friends and family, enjoying the simple moments we too often put on hold, and scrounging up any last-minute travel necessities. Oh, and of course, there are the copious amounts of reading I will be doing. To my surprise, a bulk of my packing was completed early- though I am still gathering together my smallest creature comforts, like books and personal items, which I will be especially grateful for on long cruises. As I wait through my last few days, I am overwhelmed with both nerves and excitement. In a short amount of time, my routine and perspective will completely change, and in lieu of my trepidation- I could not be anymore excited to take this step. My process will last a little over half a year; easy by no means, but perhaps one of the most rewarding adventures of my life.

 

Conclusions on the R/V Sikuliaq

And so, my time on the Sikuliaq comes to a close. Many CTD lines and supersucker attempts later, we’re done collecting data.Since we got done early, we were able to set up an ice station off of the Wainwright line. After a day of searching, we found a piece of sea ice that was large enough to be stable. Paul, our boson, drove the landing craft to get to it. We drilled and sawed into the ice to take samples and see if there was any ice algae. Afterwards, we shuttled groups of crew and science back and forth to let everyone get out on the ice. I got in a snowball fight, made snow angels with some crew friends and generally had a good time out on the ice. Afterwards, we got a speedy boat ride back through the sea ice. Nothing as  exhilarating as zooming through and around sea ice in a small boat in the Arctic!

We also were able to visit Point Hope, a small Alaskan Native village, for a day. We got to see the ceremonial whale burial grounds, and stopped in the town hall and grocery store. Afterwards, I walked around the north side of town for some alone time and a great view of the Brooks range. Those were some really gorgeous mountains. We took the landing craft back to the ship and set off again!

The ship navigated some choppy waters back through the Bering Strait. We anchored off shore near Teller to weather the storm. The next day, we finally docked in Nome and went to go celebrate a good cruise. It’s been a good time; I’ve learned a lot about CTDs, coring, nitrogen fixation and primary productivity, the Arctic, maritime life, how rigorous science is, and what it means to be a marine technician. I learned a lot about this cruise’s experiments, the ship’s seawater system, sonars, pco2 monitoring system and other underways. I also got to see the glider and super sucker and learn about both of them. I learned about deck ops and the AON morning. I got to help with sampling and even learned some about engineering. Interning has also taught me how to be more proactive, communicate professionally and work in a team. I mostly like the biological aspects and the technical aspects, and could be interested in specializing in one or both. I could be really interested in deep sea work, which would be very biological and technical. I’m also interested in doing work that’s more people oriented, working with local communities or front-line communities, perhaps implementing traditional knowledge or working with them on climate justice issues. All in all, this was a great internship to take right after school. It taught me about professionalism and oceanography, exposed me to marine careers, and gave me a better idea of what I want to do. But for now, I’m off to venture around Alaska!

P.S. I’ll put up one more photo blog. Stay tuned for pics! 🙂

Sheets and Ice Sheets: Taking the Plunge

Hey there!

This week, we’ve gone through lots of sea ice as we sail through the Arctic, to the north of Barrow and Wainwright. The Arctic Ocean views have been really gorgeous and tranquil, with the water’s surface as still and smooth as glass, reflecting the oh-so-blue sky. We’ve also gotten to see polar bears, a whole walrus colony, and a few auroras! 

With all this sea ice, the ship has been going a maximum of 2-3 knots, meaning there is more time between CTD stations.This week, I’ve learned to plot points in the Olex system, which helps us know our time to station. I’ve also relearned how to tie a bowline and a sheet bend. Sheets are ropes, or lines on a boat.

After getting through the ice, we’ve finally been able to start coring and using the supersucker. I really enjoy using the multi-corer because our camera system allows us to see what’s on the bottom. The multi-corer is also more hands-on than our CTD. It’s been fun to hop on the buddy lines, and use poles and hooks to safely deploy and recover the multi-corer.

I’ve also gotten to cut cores and sample water with Miguel Goni, a professor at Oregon State University, and his students. It’s been nice to be involved in science as well as science tech, particularly as someone interested in pursuing oceanography in graduate school. I’ve also gotten more involved this week overall. I finally got to operate the CTD, meaning that I got to direct the winch operator and tell them how deep to send the CTD, where to wait, etc. I think I was too laidback the first week, so other people got to operate the CTD and handle lines. I’ve realized that I just need to jump in more and ask to do things, rather than being shy and letting other people take the lead. Gotta take that plunge!

We’ve been sampling lots of lines: the Wainwright, Barrow, DB06 and DB04 lines, which means lots and lots of CTDs and a good bit of coring. The marine techs keep pulling intense hours, then resting when we tow the super sucker. The super sucker has to be towed continuously for 24 hours, so we can’t stop do CTDs or multi-core. This gives science a nice break, as there’s no water to process, and no cores to cut.

We’ve mostly been doing shallow water casts – 40 to 50 meters, but we also got to do some deep casts. These casts ranged from 1000-3900 meters, taking about 1 to 4 hours, respectively. We got to make souvenir cups on the deepest of the casts. We all decorated Styrofoam cups, packed them with paper towels, put them in mesh bags, then tied them onto the CTD rosette frame. We cast the CTD to 3930 meters, then pulled it back up. The cups came back bigger than a thimble, about the size of shot glasses. We all got to keep them for cruise souvenirs.

We also did test runs of the UAF carbon glider. My roommate, Brita, is the lab technician working on the glider project. Gliders are nice because you can launch them and they’ll continuously gather data for up to 4 months. One of the microcomputers on Brita’s glider went down though. We’re going to try launching it again tomorrow. We’ll do small boat ops to launch it. If we’re in the right area, we might also pick up another glider that is currently gliding around the Chukchi Sea to the North of us.

We’re at the midpoint of the cruise. I want to check in with the two marine techs for mid-internship feedback. I’ve also continued to appreciate the company of both science and crew. We’ve all gotten into a nice rhythm, and ops and data are flowing nicely. I’ve definitely made some great friends on the ship so far. Time on the R/V Sikuliaq is going far too quickly, if anything.

Blog 6: Day 28 – The End in Sight

Hello World,

 

Well where did the time go. It has been almost a month since I began my adventure in Alaska and the Arctic through the MATE program. Tasks have been checked off lists, and we are closing in on the completion of this research mission. Today, we had initially planned on deploying a mooring at our Southeast station, which we had to recover once, due to the sound source malfunctioning. Because we also already deployed transponders around the mooring to triangulate, when we re-deploy this mooring, it has to be within the triangle of the 3 transponders, making this re-deployment a little tricky. The weather has been on the rougher side, so the mooring deployment was postponed until tomorrow, and instead, we are testing a different sound source, in preparation for our final mooring deployment station.

In case I was confusing with my wording, we have 2 more moorings left to deploy. And upon completion, we will head down to Nome, Alaska.

 

It has been a very calm week for the techs. Every system has been running well with no issues, thank goodness, but it has also been a little slow. When there are problems to solve and devices to prepare for deployment, there is more action and things to learn, and I have been missing that a little bit. So, my main mentor Brandon and I decided today that our final week, we will review all the equipment and systems that the marine technicians maintain on the ship, and also work on preparing to store away the CTD rosette. I am pretty excited about that.

 

Here is to one last week of learning and finishing up this Arctic adventure!

 

Aloha,

 

 

 

WEEK 9- Breakdown, Bottles and Bees

WEEK 9
September 4-10

  As I mentioned in the previous blog, R/V Walton Smith is scheduled for a month-long cruise to Cuba in October in order to conduct studies on the coral reef using an ROV.  One of the many preparations requires all of the scientific equipment to be inventoried. An Export Control Classification Number, (ECCN), must be provided for each piece of equipment.  

  I was given the responsibility of tracking these down, which involved speaking with each manufacturer.  I also had to record all serial numbers for each item, original purchase price paid, quantity, and a basic description.  After all the data was entered into an Excel file, it was sent through the governmental channels for approval.  

  Early Wednesday morning we prepared to depart for a two-day cruise with NOAA as part of their continuous studies on the Gulf Stream current.  The Chief Engineer was absent due to jury duty, and it appeared that the ship did not want to leave without him.  Before we had even left the dock, problems with the electrical system forced us to abort.

  It was later determined to be an issue with a breaker, and it was promptly replaced.  Since next week’s schedule only consists of a three-day cruise beginning Wednesday, NOAA’s cruise is deferred to this coming Monday and Tuesday.

  I spent the rest of the week fitting our CTD with brand new Niskin bottles, part of the shipment that arrived from Brazil last month.  With new bottles and freshly calibrated sensors, and a newly terminated 322 cable, the CTD is now in tip top shape.

  On Friday we were given the opportunity to attend shipboard crane operation training, conducted by Captain Lake.  We were instructed on proper rules and safety involving crane operation and will be given the chance to be tested in order to obtain an official certificate.

  Captain Lake is also a beekeeper on the side and I have had the opportunity to assist him in several related activities.  This weekend we began a removal job that involved hives located in two different spots up inside a soffit of a house in North Miami.

  It always impresses me that people spend the time and money to have honey bees removed, rather than simply killing them.  By the end of the weekend we had one of the hives relocated into frames and placed into a special wooden hive, which was left in the yard in order for the stragglers to move into.  We’ll return next weekend and tackle the other hive.

Stripping the CTD of the old Niskin bottles

Blog 5: Day 26 – Pictures!

Myself, troubleshooting met data networks.

National Geospatial-Intelligence Agency analyst, Jason Otero (left) and Oregon State Univ. marine technician Brandon D’Andrea (right)

Jason and two sea gliders that were deployed this cruise.

The ships crew craning one of the acoustic sources from up above to the back deck.

Scientists and technicians attaching floats to the mooring line as they are deployed.

The USCGC Healy bridge and some officers and crew on watch.

Healy crossfit coach, BM2 Ben Ahlin, during a workout.

The lowest the sun went one day, somewhere in the Arctic.

Page 69 of 89