Category: Vessel/Laboratory Page 67 of 89

Week Five: We’re on the move

Week Five: What a week, started in the Pacific Ocean and now I’m in the Atlantic.  Thursday was our second engineering dive and our last dive in the Pacific because come Friday we were on way to Panama.  Friday was a workday, the sub had to go through its quarterly checks and it was all hands on to get everything finished.  For most of the techs this was their last day for work because once we got to Panama the remaining people from the last cruise got to leave.  We got into Panama Saturday morning; I have never seen so many ships together in one place.  There was a staging area just outside the canal, were ships would line up and wait their tern.  The Atlantis is a large ship for a research vessel but it was nothing compared to the tankers, fraters, and car carriers that we were sitting next to.  Saturday was a great day because with a lot of people getting off there wasn’t much effort getting put to keeping everyone on task. This allowed for a late start and with being so close to shore I had a chance to make a few phone calls.  It wasn’t our turn to go through the canal till late that night but being able to sit outside with the cool night breeze, watching us go through the locks was still really amazing.  Sunday we started off to our first Atlantic dive location, lust off the cost of Jamaica.  There was one rather big problem with this plan though and would be the tropical storm forming in our way.  The storm wasn’t our biggest problem we had to face that day.  Wile we were performing our checks on the HP air system there was a discovery of water in the air tanks.  This means that there was a leak some were in the system and we had to now run through and check the whole system.  This continued on until late Monday night and because of a mandatory 24-hour period to monitor the tanks we missed our dive schedule this morning.  So now we are up to today, well today we did not get the chance to do our deep dive.  We can’t stay and wait till tomorrow because with our due date at Woods Hole being on the 30th we have a schedule to meet.  So we are working out a new dive location among the islands just north of Haiti.  Well that about sums up the pass week.

I had some more pictures but due to a completely new issue I can only have one on the front of my post. This is why I didn’t have the post with pictures like I said.  I am working it out with people on my end but for some reason the ships network hasn’t been to friendly with MATE’s web page.  This has been a constant struggle.

Week Five on the R/V Sharp

This week was full of hard work, as I spent the week primarily assisting with dredging on George’s Bank, several hundred miles off Cape Cod. This area of shallows I had read about is a very productive, active fishing spot, where fishermen have been venturing for centuries. It was cool to say that I have now been out there! The habcam was back in the water on Saturday, as we were working our way out to the northeast corner of the large bank. Christian and I worked on several computer issues, such as the camera and knudsen echosunder computers restarting. It took several hours and much wire tracing, but we eventually solved the problem and got cameras back on line.

On Sunday and Monday, we spent our entire watch dredging while working our way back west, with a CTD cast mixed in every third tow. The hauls were different than in previous areas, because most of the bags were stuffed full, leaving us with much more work to do shoveling and sorting our catches after every tow. We got full bags of scallops, sand, and on some tows, massive piles of sand dollars that left green slime everywhere. There were some interesting organisms, like monkfish, several three pound lobsters, and barn door skates. The monkfish, with their ugly looking, giant mouths, actually had edible meat in the tail, which Paul, the cook, filleted and cooked up for just our watchgroup. I got to try a few bites, and it was amazing! Although the dredging was hard work, it did make time go by fast, and in general there were nice days to be out on deck.

Tuesday marked an important milestone: a month of being onboard for me. I started the day with pan fried scallops, featuring the largest ones I have ever seen (that I helped shuck)! We continued dredging with the end in sight, and luckily the loads started to get a little smaller. Christian gave me the chance to run a CTD cast completely on my own, letting me operate the computer and communicate with the bridge and engineer operating the winch to tell them when to deploy and haul back the instrument. Towards the end of the day, the weather started to turn bad, as we met a lightning storm and heavy winds, causing us to have to skip a CTD cast and dredge intermittently when the lightning was not an issue. Thanks to Captain Jimmy for watching out for us!

Wednesday was nice and warm, a good day to arrive back in Woods Hole for several hours as a planned stop to refuel, get more food, and change out several scientists. I helped catch lines, shut off the flow through system, stop data collection, clean the boat, and prep rooms for the new scientists. I got in a quick call home before it was time to cast off again for the second part of leg three, this time surveying the southern side of George’s Bank. Once again, I started the flow through system in order to begin data collection by our various transducers.

Thursday was flat calm and sunny as Christian and I started our watch. We pulled up the habcam and got the boat set up for dredging again, then helped dredge and perform occasional CTD casts with a new crew of scientists. It sure was a quick transition back in to routine, almost like we were never in port at all!

Finally, today Christian and I continued dredging, pulling up starfish, sand dollars, and the occasional scallop. I saved a few organisms from our tows that hopefully I can clean and dry on the way home. By the last few hours of the watch, all of the dredge stations for the entire cruise were complete, and many of the scientists thanked us for all of our work to help make the dredging operation a success. It was good to know that we have contributed so much to this important survey. We put the habcam back in the water so we could continue to tow it through the last transects. The rest of the watch we spent securing the ship in preparation for the rough weather ahead. We got the dredge on the work table and strapped it down, hosed down the deck, replaced the solid bulkhead that holds the CTD in place, and secured miscellaneous items. It is crazy to think that I only have four more days of this cruise and only one more week on board left. The time has just been flying by! The next blog post I will be doing on my last day aboard, and I will hope to post more pictures soon. Until then!

 

Huxley

 

A New Vessel in Mississippi

We made it back to port, after a very long transit from Mississippi Canyon to LUMCON. Due to the sheer size and amount of our equipment, we spent two days demobilizing. A crane and sixteen wheeler was ordered for the removal of the ROV and ROV tech van. The following days consisted of unloading equipment and preparing for our following cruise. Because our CTD was not used on our prior cruise, we had to reload and prepare our CTD with adequate sensors, reterminate our two CTD wires and regrip our hanging cable. In addition to  CTD work, I flushed our MIDAS flow through system using pumps and a 10% bleach bath. I let the pipes sit over night and by the time we were finished demobilizing, the pipes were well-cleaned. The usual office duties and sensor inventory was also completed.

After a long few days, I made my way over to Gulfport Mississippi to board another research vessel- the R/V Point Sur. In between my time on the Pelican and Point Sur, I made a detour to Texas. The trip was very enjoyable and it was nice to stop and smell the roses after a long cruise. Feeling well rested and high in spirits, I docked the Point Sur.

Point Sur Endeavors:

I am admist my first Point Sur cruise: the mission is multi-coring and CTD work.

Our first day came with some variability with the multi-core system. Specifically, we had difficulty getting the MC800 trigger mechnisms to fire at depth. All the parts are functioning as they should- after some refitting, regreasing and some serious TLC- but we continued to perfect our bottom method throughout the week. With the multi-core, it is important to drive the core- with the winch- into the sediment properly, but depending on the sediment, you may not want to linger for too long or too little on the bottom. Attached to our multi-core system is a transducer- so we used HYPACK and the Tracklink software once again- a skill I am now more increasingly familiar with. Throughout the trip I learned a lot about multi-coring, its trigger mechanisms and how it works. The device can be finicy and it is important to test, test, test before deploying down to 2000+m.

In addition to multi-coring, I learned a lot on the mechnical and tech side of things. Mechnically, I began operating the a-frame, j-frame and crane on the boat throughout the entirity of the cruise. The experience was a good confidence builder, and while it requires a great amount of responsibility, I am happy to reach a point where I am capable of taking that responsibility on. In addition to a few wire terminations on the multi-core winch wire, I fixed a few CTD landyard bottles and even got to shrink another cup! I will post photos below.

On the tech side of things, this cruise enabled me to better my CTD software skills- specifically in using its data processing hardware and converting cnv, dat and text files! I also installed several VGA monitors, hooked them up with ethernet jacks, ran several cables throughout the walls and terminated a ADU800 (heading, pitch and roll system) connector. I am very thankful for the extreme welcome I was given on the Point Sur- they made my time away from my home ship more than comforting!

 

Week 4 -the beginning of the engineering cruse-

The adventure continues…  Yes week four has come and gone with me still a little behind schedule and this time it’s my fault.  The time spent from my last post to this one has been buzzy.  Last Thursday we finished prepping the batteries as the last step before needing to swap them out on the sub.  It’s a good thing we got the batteries done when we did because it became all hands on deck for an early recovery on Friday.  After an average start to the day the sub detected a ground somewhere in the main hydrologic system.  This ground forced the pilot to shut down both manipulators and affectively canceling the rest of the dive.  We were able to get the sub on the deck by noon and thus the work to fix the problem started.   The work continued on into the night only to find there was never a problem in the hydrologic system but in the ground detector itself.  To top it all off we ended up blowing a serge protector in the port power bottle and had to get inside to flip the switch.  With Friday spilling over into Saturday and only a couple of hours of rest we got the sub in the water on schedule for science’s twenty first, and last dive of their cruse.  Most of us then nocked off early and proceeded to get some much-needed reset.  Saturday afternoon quickly came around and the cleaning started.  We needed to have everything cleaned and ready for post cruse once we got into port and there was not one second to lose.  By Sunday morning we were back into port in Puntarenas, Costa Rica.  Most of our day was spent cleaning and getting the sub ready for the up and coming engineering cruse but we still had a chance to say Good By to the science group.  Monday was our first day off and it was not wasted. Looking for something to do so I jumped in with a group that was heading to go and see the Cloud Forest in Montverde.  I had a grate time but I didn’t take the change in elevation as well as I hoped and struggled with some of the paths.  We got back a little later then we had expected and I was out as soon as I hit my bunk.  Tuesday was back to work.  We got our new crew for the engineering cruse and they had a new list of objectives to work on with the sub.   This cruse has most of the top personal who work on Alvin as they are needing different systems checked and requirements met so we can take the sub to its maximum depth here in a couple of days.  We ended up working most of the day and most people went to hit the sack early… I was one of them.  I had completely forgotten to do my blog hence the Wednesday post.  Today wasn’t so bad.  We had our first engineering dive and got down to 1400 meters we are planning on going to a site tomorrow that starts at 1100 meters but bottoms out at 1800 meters.  Shortly after we set sail for Panama and have plans for several more dives in the Caribbean.  We also picked up some navy VIPs who will be accompanying us on these dives.  

O one more thing because there is a significantly smaller amount of people on board I have been able to get photos to work now. So here is some to get started.

 

                                               

        This is me working on the batteries.                         Batteries being completed.

     

Two Images from the science dives.

                                          

Two images of me working on the sub.

 

                                  

Some photos from the Cloud Forest

I will have a dedicated blog post for pictures tomorrow

Florida on the R/V F. G. Walton Smith

I will be leaving for Florida on the 18th of June; right now I am making sure I have a list of things I will need while on the internship. I have emailed back and forth with my host and have a good idea of everything I will need. I want to make sure I am prepared as I can be and am professional.

I consider myself very fortunate to be going on this internship at sea, and I am very excited to progress more as a marine technician and to experience working at sea. There will be three seperate research cruises I will be a part of – they offer the unique oppurtunity to broaden my knowledge and skills of various marine technical work.

In the days to come, I will be making sure that I have everything I need. Hopefully, I will not forget anything too important!

-Wolfgang Irrig

Week Four on the R/V Sharp

This week on the Sharp seemed to fly by, as I was kept busy with a lot of time on deck. I can say that every time I work with the crew, there is always a problem to solve, and I always learn something new. Last Saturday was a great day, where I continued to monitor the multibeam, as well as perform other tasks to benefit the techs like going online to get brochures for all of the sensors onboard and making a new winch calibration table. I was even able to teach KG a few skills in Microsoft Excel that I had learned in some of my science classes. The CTD winch was fixed, so we could continue to do casts. There were frequent issues with the habcam not outputting video, so we decided to pull it up and spend the rest of the cruise dredging. Unfortunately, there was a long steam to the next site, so the work would be left to the other watch. Sunday was even nicer (if that’s possible), a beautiful day to prep the boat for coming in to port at Woods Hole, Massachusetts. I washed all the sand off the deck and then KG taught me a little about dock lines and the way that we set them up on the Sharp. We passed land masses such as Nantucket and Martha’s Vineyard, while seeing much more activity and boat traffic. I was the first one on the boat to jump to shore, as I got off to secure dock lines and the gangway.

I got the rest of the day off, and went out with two of the mates and KG to explore the town, which I had never been to before. It was quite gentrified and touristy, and I was blown away by the high prices at the restaurant we ate at. When we returned to the boat, a few fresh crew members (most of whom I sailed with on the first leg) joined us to load food. Monday was cold, raw, and rainy, as we said goodbye to some crew members, like Pam, Jonathan, and KG, and picked up some new ones like Christian, Paul, and Captain Jimmy. We put fresh linens on beds, cleaned science rooms, and helped scientists secure new equipment like tanks and chillers. The engineers noticed that our holding tank was nearly full, and we would have to find a way to pump it out. I was surprised at what we did next; the solution was to move the boat a quarter mile down the harbor to use a pumpout station, then move it back to our slip. That is what we did, which I found fun because I like line handling and wanted to get more practice with it on a large vessel. Once this was done, I got the rest of the day off, so I took a much needed run to stretch out my legs and explore a little more.

Tuesday was departure day for leg three, as Christian and I worked to continue to secure the boat. I handled lines again for the departure, started up the flow through system, and calibrated the SMS. Wednesday was nicer but moderately rough, where dredging began in full force off Cape Cod. Every third dredge, we did a CTD cast, which is becoming routine now thanks to KG’s instruction on the previous leg. It was interesting that every dredge resulted in different substrates and organisms, some full of sand dollars, some with rocks, crabs, sea stars, and some with scallops. We ran into several problems along the way, such as rocks tearing dredge nets, causing us to have to use the crane to swap out the dredge for a spare so science could work on repairing them. Also, Casey, the second engineer, noticed that the ramp on the stern of the boat used to lower the habcam in to the water was bending under the strain due to a corroded frame. We discussed the possibility of an emergency stop in a port to weld it properly. I also got sight of more humpback whales, some within just a few meters of the boat (amazing pictures to come)!

Thursday resulted in more dredging, trying to finish up stations before we decided to make the emergency stop the following day to repair the ramp. One of the dredges was full of scallops, and Christian, Casey, and I saved a few buckets to shuck between tows. I’m not tired of eating scallops yet! We saw more cool organisms like hagfish and a few baby octopi, which we kept in the tanks. Dredging finished with a few hours left of our watch, so Christian and I hosed down the deck, secured the table, and raised the keel to prep for the steam back.

Today I woke up to catch a few lines, as we were back in Woods Hole again. I took a nap after this to attempt to stay on my watch routine of noon to midnight, as this was to be a quick turnaround. After lunch, I went to work, helping Sean, Casey, and TR, a deckhand, lift the ramp with the crane, grind corrosion off the bolts that hold it in place, re install the ramp, and tighten it down. By mid afternoon, we were done with the job. I was helping clean up the tool room and get the boat ready for sea again. I undid lines, started the SMS, and we were off to the habcam sites with a solid deployment ramp. This was to be a long steam out to the beginning of George’s Bank way off Cape Cod, so I had some down time on watch to read and prepare for more work ahead. I also got a chance to talk to Jimmy on the bridge, who told me to keep in touch with him once I got off the boat. As a job crewing a research vessel is definitely appealing to me, I told him that I definitely would. Soon we will be well out to sea to collect more data. Until next week!

 

Huxley

 

Week three is a Little late

Now that the third week has come to a close and one half of my time aboard the R/V Atlantis is just about over I can really get a sense of what life is like working on a research vessel.  First off any standers of a normal workday are gone.  As one of my fellow Alvin workers said it best “everyday is like a Monday.”  We wake up early every morning barely coherent, look for that pot of coffee and go through the same routine.  With no weekends off and always have work to do you would think that this would make this life style unbearable but it is just the opposite.  For everyone out here the benefits out way the cost.  The biggest problem we’ll face is not the when the sub decides to misbehave but it is time.  When you’re working with a piece of equipment that is designed to withstand more then 400 times the pressure of earths atmosphere.  Along with having to have the sub ready every morning promptly at 7:30 so the science team can go down and collect the samples they need, time is not really on your side.  Though we have been very fortunate this cruse that there have been no major issues with Alvin, even something as simple as an unwanted ground in the electrical system can set us back.  When working in this type of environment the biggest key to success is work cohesion.  Being able to get along with your coworkers is so important in this filed because you have to spend so much time together under high stress situations.  As an intern the first thing I learned was to know when it was time to get in and help out and then when to get out of the way. 

 

We have had 16 consecutive dives now with 21 total dives schedule for the science cruse.  Keeping track of day-to-day events has been getting harder because everyday is the same thing and at this point it all starts to mix together.  One day can feel like a lifetime but one week can feel like a day.  Despite this I am still enjoying my time out here, I love the work and I’m enjoying the people.  We are all quite literally stuck in the same boat.  As the science cruse is coming to an end we are expected to be arriving into port either the 10th or the 11th.  Once then we will say our goodbyes and head back out for the engineering segment.  There are only 4 dives planed for the engineering cruse, were we will be diving to the subs current maximum depth of 4500 meters (14,763 feet).  For a better example most naval subs cat go below a 1,000 feet (304 meters).  At the depth of 4500 meters you will be experiencing 450 atmospheres worth of pressure.  With experiencing 14.7 PSI (pounds per square inch) in one atmosphere, Alvin will be experiencing 6,615 PSI at 450 atmospheres.  Once the engineering dives are over I will be staying on the ship for the 2-week cruse back to Woods Hole Massachusetts.  I am not quite sure what jobs they will be having me do during the transit but I know I will be put to work.

 

Now on to the more interesting topic of what did I do this week?  I am getting this blog out a little late again do to a network failure on Sunday and a series of unfortunate events on my behalf Monday night.  The week started out just like any other.  On Tuesday we had to take the battery that I have been working on out in order to begin cleaning of the battery hold for ship inspection.  The cleaning didn’t start till Thursday and lasted over into Friday.  Thursday was game night on the ship so a bunch of us got together and played some card games.  On Friday we had gotten to a new dive cite and this one was only around 400 meters deep witch is very shallow for this sub.  Strangely this became problematic because all the connectors on the sub are meant to perform at more extreme depths.  We ended up having to deal with a ground in a cable witch was caused by a small amount of water making its way into the connector.  We thought we fixed the problem the night before but the ground returned the fallowing morning and we had to postpone the dive till 11.  These problems continued and on Sunday the sub had to surface half way through the dive because we got a ground in the hydraulic motor connection. This completely prevented any used of the mechanical arms on the sub so the dive could not be completed.  We were able to quickly fix the problem and get the sub back into the water only 30 minutes later.  Sunday night we got a massive storm witch prevented any use of the network and with the only free time I have is at night I could not get the blog out then.  On Monday we moved the batteries back into the hold and I got to work prepping them for final assembly. Once returned one of the subs cameras stopped working and we’ve begun working on fixing that.   Monday night we begun transit to a new location and just as I was ready so send my blog post the ship changed heading and blocked the satellite dish once again taking down the network.  Tuesday, today I had finished prepping the batteries and we are planning to start assembly tomorrow.  That just about sums up what I did for the last week.

 

I also want to say I was suppose to have some images in the last blog posting but didn’t due to a complication wile up loading so I’m going to try again tonight.  If I cant get it to work I will post the images separately in an few days once we get back to port. 

Pictures from Scallop Leg 2

/files/marine/files/img_0773.jpg : Tied up in Lewes, DE

/files/marine/files/img_0777.jpg : Leaving Lewes Harbor

/files/marine/files/img_0783.jpg : We steamed north past Cape May, NJ

/files/marine/files/img_0799.jpg : I spent much of this leg operating the multibeam snoar, that reveals a map of the elevation of the ocean floor 

/files/marine/files/img_0809.jpg : We steamed past Block Island and its new wind farm

/files/marine/files/img_0812.jpg : The storm we navigated through

/files/marine/files/img_0816.jpg : Scallops!

/files/marine/files/img_0819.jpg : In some dredges we caught hundreds of scallops

/files/marine/files/img_0821.jpg : In others we caught boulders

/files/marine/files/img_0825.jpg : Massimo, one of the scientists, myself, and Jonathan, the engineers, collected sediment with the grab sampler

/files/marine/files/IMG_0829.JPG : Who needs a whale watch?

/files/marine/files/IMG_0835.JPG : Sunset at sea

/files/marine/files/IMG_0841.JPG : Welcome to Woods Hole, MA!

/files/marine/files/IMG_0842.JPG : The R/V Armstrong, the research vessel for Wood’s Hole Oceanographic Institute

/files/marine/files/IMG_0846.JPG : The Sharp tied up in Woods Hole

 

Beautiful Deep Sea Discoveries- Photos Galor, A MUST Read!

          

The back of our computer control panel       Can you spy Wilma? She made it and was set free!

-or as I like to think- my wire castle.

PC: Jason Bradley

                    

Brittle Star                                 Sea Cucumber- ventral view                 Glass Sponge

      

  Stone Coral                               Translucent Sea Cucumber                     Flat Worm

 

 

                

   Stalk Anenome                       Translucent  Sea Cucumber                Squat Lobster

Week Three on R/V Sharp

This week was quite interesting, where I got a chance to see many different operations and learn a lot from KG, the senior tech onboard. The theme of this week was encountering a steady stream of small problems, as opposed to several larger issues onboard the previous leg.

Last Saturday, a very nice day, the scientists continued to tow the habcam near Long Island, close enough at one point that we could make out houses on the beach, so most of the crew headed up to the bridge holding their phones in the air trying to get service. We started the multibeam up again, but had issues with the computer freezing, so we opened up the unit and reset a chip which seemed to solve the problem. After a crash course from KG, I was operating the multibeam sonar on my own, adjusting settings as the bottom changed and sending profiles of the bottom to the scientists. I also installed a new camera on the stack pointing towards the dredging area, where I learned how to terminate the cable and secure connection points with splicing tape.

Sunday came with more multibeam and more freezing issues, so we took some screenshots of the issues and KG sent them to an expert on shore. I was assigned the task of writing up a procedure pertaining how to start up and operate the multibeam to help out future techs and interns on the boat. When I did my daily check of the SMS system, I noticed that the temperature and humidity were way off. We went aloft and opened up the sensor, which had water inside, so we replaced it with a spare that we had onboard. KG stressed the importance of always having spare parts while at sea. Monday started with me being awakened by the crash of pots and pans in the galley; another rough day at sea. We were on the high seas, 50 miles off Nantucket, getting prepped to start the first multibeam survey of the canyons for suitable juvenile lobster habitat. It was very difficult to watch a computer with all of that rolling, so I terminated more ethernet cables and worked with KG to learn the model numbers and names of CTD sensors.

The multibeam was having issues finding the bottom due to the contant pitching of the ship, and on Tuesday we eventually pulled out the habcam, which had a ripped open termination and a point in the fiber optic cable where some of the strands had come unlaid. We cut the cable past that point so the scientists could work on a new termination, a long process that could take more than a day. So instead we headed to the first dredging site, where the science wanted to run a CTD cast to obtain water quality data at depth. KG showed me the process and walked me through the entire thing, from setting the device up, dropping it in, recovering water samples, and recovering it with the winch. Once this was complete, we began dredging, going through the motions of launching and recovering the large, rusty dredge, then jumping on the table and shoveling our catch to the scientists who sorted out the organisms they wanted. Up here, our catch was much different than the southern leg, with much less sand, more mud, and WAY more scallops, as well as flounder and mean looking goosefish. Between dredges, KG, myself, and Jonathan, one of the engineers, shucked scallops for the cook. It was worth it, because the next few days we enjoyed great meals like bacon wrapped scallops and scallop ceviche.

Wednesday was foggy but much flatter, and we came out on deck to find a winch we need for dredging leaking hydraulic fluid. All we could do was wrap it until we got to port and hope it doesn’t get worse! We did a few more CTD casts between dredges, and KG let me operate the computer controlling the CTD. He also showed me how he processes the data, and let me explore the program that cleans up the data and produces nice looking graphs. Dredging became more tedious as we mostly recovered rocks, some quite large, that we had to pick up or roll off the table. During one of the haulbacks, there was a break in communication and I left a line tied down that ended up snapping off a cleat. It was not a critical piece, though, but it’s always important to know what is happening on deck! On the last dredge of my watch, I talked to Sean, the relief captain, up in the wheelhouse, who showed me how he maneuvers the boat during a tow. It was a long day, but I learned from a lot of different people!

Thursday, another foggy day with a little more roll, began with a few dredges, then it was time to steam to the grab sample site. Once there, we lowered the keel and turned on the ADCP to monitor currents at the stations. KG, Jonathan, and I worked to get the metal grab sampler in the water and winch it down. Due to the roll of the boat and a wire that was not marked with any sort of depths, it was hard to tell when we had hit bottom. After many hours, we only had one sample, and had to move on to another multibeam survey and more dredging. Luckily, during the second survey, the multibeam worked great under my control and science was very happy. Another problem soon struck, when the winch computer was no longer reading tension as we were launching a dredge, and later the CTD winch left the device hanging halfway down to the bottom for nearly an hour. KG and I went down to the engine room to reset the computer, but it wasn’t quite done causing problems.

Today the habcam was back in the water, and it was a nice, sunny, calm day. We were doing habcam tows off Cape Cod and working our way back south to Nantucket. I was monitoring the multibeam with no major issues, until there was commotion in the lab due to a winch tension spike, everyone thinking we had struck bottom hard with the habcam. To pass the time, KG had me work on a spreadsheet that gave information about max depths of various sensors. However, we pulled it up to reveal no damage, and it was likely another fault in the winch computer. We recalibrated the computer and dropped the habcam back in, but KG stressed to Sean and the engineers that this is an issue that needs to be looked out by a professional at electrical equipment. Later, KG gave me a brief introduction to the different types of serial and VGA connections and how computers “talk” to each other. By Sunday afternoon we will be tied up in Wood’s Hole, MA where I will post more pictures. Until then!

 

Huxley

 

Page 67 of 89

Powered by WordPress & Theme by Anders Norén