Category: Host Page 33 of 89

Introduction

Hello,

It is a great honor to be selected for this internship opportunity. I am a full-time student at Northwestern Michigan College pursuing a Bachelor’s Degree in Marine technology and will be graduating this Summer with an Associate Degree in Applied Sciences with a focus on Marine Technology. The ROV and robotics side of marine technology are my favorite subjects but I’m also very interested in sonar and bathymetry. I have always had a great appreciation for the lakes and oceans. I enjoy learning about marine habitats and marine biology. To say that I am excited to get out on the R/V Hugh R. Sharpe is an understatement, I can barely contain my excitement.

 

Achievements

  • • Dean’s List Award from Fall 2021- Fall 2022
  • • 4.0 GPA in Marine Technology courses

Activities

  • Working on cars, tractors, and motors
  • Enjoying/learning about nature and animals
  • Creating/repairing circuits and electronics 
  • President of the NMC Rotaract Club 2021(sub-group of Rotary International)
  • Rotary International Exchange Student – Germany

Week 2: BATS Cruise and CTD’s

April 10, 2023

Today was a windy and rainy day, but luckily most of our tasks were inside the ship, so wet gear was not required.

First I helped Oban install a new PC for an existing CCTV camera that points towards the CTD winch. It involved wiring, updates, program installation, and a little bit of hardware to mount the PC and keep it from moving during deployment. 

Then I helped clean a net deployment latch that had gotten covered in glue and sponge for some reason, and thus didn’t function well.

Then Lydia had me go down to the lower deck to open up the Pinger to get diameters of the O-rings and check the battery sizes, so that the techs can order and replace them. It was heavy and hot down there, and I was down there for about an hour. It took much longer than anticipated because measuring the O-rings was not easy. Eventually I took a rough estimate, went back to the tech lab to look for the possible dimensions, and then went back down to see which ones matched closest. 

April 11, 2023

This morning Rory (Mentor) showed me how to check and replace batteries for the UPS’s on board. UPS’s (Uninterrupted Power Supply) are essentially a temporary backup power supply for when the main generators malfunction and the backup generators need time to turn on. Machinery and sensors are plugged into these so that when there is a power failure, the UPS jumps to battery usage and keeps the device powered up long enough for the generators to kick in. There are many already installed aboard the R/V AE, however there are a few old unused ones that need testing and battery replacement. You can see an opened one below:

Rory gave me 3 of them to work on as a side project for when the main techs don’t need any additional help. Once I loaded them on board, I had a side project with Oban.

I helped him install a PA system from the tech lab to the lab on the bow. This required wire management with zip ties and terminators with crimps instead of soldering. We also used an interesting insulation material that is gooey and sticky for internal wire insulation that we then sheathed with stretch tape. We initially were going to use heat shrink but it didn’t fit after the insulation was added. 

Once the PA system (a horn speaker) was attached to the bow lab, we had to feed the wire back to the tech lab. This required going from the outside to the inside which meant going through a watertight port. These ports need to basically have removable and accessible wire ports but also remain watertight when not in use. Unfortunately the removal and addition of the wires is not easy. It requires a lot of finagling. Plus, if the rubber material (seen in image) is at all decomposed or corroded, it makes it stickier and more difficult to remove. As can be seen are the little blue and black “rings” around each of the wires. 

Each of the rings can be either added or removed to accommodate different wire sizes. These rings are composed of 2 varying sized “rectangles” that are wrapped around the wire to create hollow cylindrical hemispheres. Interestingly, though I’d expect to use small bits of thin glue to keep the rectangular rubber pieces surrounding the wire in place, instead you use lubricant! Also, instead of building the rings around the wire, there’s a hemispherical “pocket” that each of the rectangular ring inserts will sit, and then once enough rubber material is built up, the wire is sandwiched in between and then forced back into the main component. For reference, removing and re-inserting required the use of a punch and chisel, as well as a big rubber mallet, and lots of patience and force. By the end of the whole debacle Oban and I were both red in the face and sweaty, no thanks to the perfect yet warm and humid Bermuda weather.

Throughout the day I also got lots of practice with finding where everything is in toolboxes which I’m sure will be very helpful. 

Towards the end of the day I took the 2 UPS with newly replaced batteries (the third is not turning on so requires further investigation) and set them on an overnight charge to test later.

April 12, 2023

Today we leave for a cruise! We will be departing at around 1300. Apparently we would have gone earlier but can only leave when the tides permit, so before then we started off with a safety briefing and fire drill. Apparently I have some responsibilities in regards to the fire- taking care of scientists and whatnot. I’m not sure who’s idea that was (just kidding.)

Oban and I then tested the audio system that we installed yesterday. 

I put on seasickness patch just in case.

On cruises techs have 12 Hour shifts instead of 8 hour shifts. I’m a bit nervous, hopefully I’ll be able to sleep and rest up plenty to have enough energy to be helpful. The tech’s schedule is 3am – 3pm. My schedule is set to overlap each of theirs by a few hours and is tentatively 9am-9pm, unless there is a significantly interesting operation on deck that the techs want me to be a part of lying outside of the 9 to 9 window.

I need to get everyone’s WhattsApp so I can talk to them later. I hope they add me.

Set off on the cruise and so far so good! I was feeling a bit queasy during our initial transit but since I used the seasickness patch it wasn’t too bad. I was also feeling exhausted, so after I took a quick nap, everything was fine! I think I can officially say that I’ve got my sea legs. 

We did 2 CTD casts during my shift today. I got to watch both of the deployments, Lydia is an old hat at this. The first cast was a shallow water cast at 500m. For the second cast at around 3500 m, we removed the PAR (Photosynthetically Active Radiation) sensor because it is “only” pressure rated to 2000m. This sensor is used to record the light penetration at depth, and of course is only really useful for the first hundred meters or so. We then replaced it with a sensor that can determine how many rotations the CTD experiences on the way down and back. Lydia invented this device, and mentioned that it uses an internal compass. I think that it operates assuming that it is always positioned upright? The MT’s are unsure if the rotation of the CTD affects the data, but Lydia mentioned that this sensor is just to begin observing to see if it does affect it at all. I assume that the rotation of the CTD does not affect the integrity of the data too much, but likely does affect the load bearing that the wire holding the CTD can handle. 

We can still see the shore of Bermuda which is nice because it gives orientation. I was kind of hoping to go out so far as to not see it anymore, so as to feel entirely isolated and get the full “at sea” experience.

April 13, 2023

First night wasn’t entirely restful, but I did get some sleep. I kept falling asleep and then waking up again. I think both rocking and the goings on in the ship kept me awake with the occasional door slams and “bumps” in the night. Tonight I’ll try ear plugs.

The first thing I did was observe the PITTS deployment which was quite fascinating to see. There are a bunch of tubes oriented vertically with the tops open all held in a rack, 5 tubes per rack. All along a line these racks are placed in with a weight at the bottom of the line. There are many lines severed and strung together with proper connections, each break in the line is where the basket of tubes is placed. At the top there are large buoy’s that keep the line oriented vertically within the water column. The goal for each of the tubes is to remain suspended at different depths of the water column, and collect “marine snow” during the entirety of the deployment. At the surface of the water there is a floating buoy with a large pole extending up as pictured. This is satellite communication so that we can go and find it again.

After that we did another CTD cast to 1200m, and upon retrieval we could see that the containers 16 and 24 did not fire again. Apparently Lydia had isolated the problem last night and it was determined that the mechanism that triggers the magnet that closes the cylinder is no longer water tight. There are ways that this can be temporarily fixed, but it seems that that method had already been used, therefore Oban decided that we should replace the mechanism altogether. There is a website that is used to keep track of all the tools and equipment on board, and in what state they are in. Checking this we could see that there is another mechanism available for use in the lower deck MT storage compartment. Oban and I went and grabbed it and began working on replacing the one on the CTD with the one that was in storage. This required moving some of the cylinders and wrenching bolts in awkward positions, you can see the removed cylinders in the picture below.

There was a little confusion on how to remove the current mechanism but luckily we were able to remove and replace it without difficulty. All this occurred while they were also doing plankton tows, and so had to stop what we were doing every 20 minutes or so. 

Now all that is left is to see if we replaced it correctly, and the only way to do that is to wait for the recovery and look at it in person.

At around 900 ascending CTD, the scientist on duty Alfonso and I noticed that the secondary salinity sensor appeared to be misreporting data. The difference between the primary and secondary was huge. After that the oxygen sensor began to malfunction as well. Oban mentioned that likely the cap came off while ascending, and since the salinity and oxygen sensors are on the same casing, it makes sense that they are both misreporting data. Interestingly though, the secondary temperature sensor seems to still be functioning fine, which is strange because it is also with the oxygen and salinity sensors. Here you can see how different the sensors were reading data. On the left is the good sensors, and in the middle is the haywire sensors and the innacuracies represented by all the horizontal yello lines.

 I suppose it’s things like this that are why we have backups of everything. Apparently the fix for this is a simple one, but unfortunately it seems we’ll have to wait until the CTD is recovered to fix it, then plug in the cover again. 

CTD successfully recovered! Unfortunately they don’t know what the problem is with the sensor, so Lydia and I replaced it with one of the backups. This required crawling underneath the CTD and loosening some screws. Here’s a cool image from below.

It appears that all the bottles successfully fired which means Oban and I installed the center mechanism properly. One bottle didn’t close correctly, but that was due to the lid being askew rather than the latches misfiring. 

We then did a C-OPS with Matt, which I still don’t fully understand, but I believe it’s a callibration test for the sattelites, which involves letting a line trail behind the boat until the sensor reads 85m and then pulling it back up and doing it another two times. It’s quite rudamentary in that you just drop the wire in and then all hands on deck grab and hoist the wire back up. Deck hands are basically running back and forth in order to retrieve this wire. I think next time they’re debating trying this with a block on the big A-frame in order to make it easier to pull.

I plan on working on the UPS later this evening, because we have a deep core with the CTD and that takes a long time, so there should be time in between to work on the UPS.

We sent the deep core CTD down and I got to deploy it myself instead of just watching this time!!!! It was super cool. 

I started working on the UPS after the CTD deep cast deployment. However I stopped a minute and a half in because the noise was unbearable and people are sleeping downstairs. I even had first mate Emmy come check to see what the noise is. I tested the grey 290W-360W with two box fans which will take up approximately 200W-210W. A good test will run for about 20 minutes, but having the alarm blast for 20 minutes straight didn’t seem like a good thing at the moment with people sleeping. I may try this again if I can find a plug outside. 

Towards the end of the day I had an hour left and decided to open up the “junk” UPS again to see if I could further isolate the problem. This UPS is from 2011, and something in it doesn’t work. The past few days I’ve been taking it apart and testing it with a multimeter and batteries but it’s quite difficult to reach into, and we’re dealing with 120V AC power which can be quite dangerous. When plugging the UPS in, it doesn’t even turn on and there is no DC voltage coming out of the battery leads. Today I was able to determine that the UPS is indeed getting 120V AC power initially, but somewhere between the AC input to DC converter there seems to be a problem. An hour had passed by and so it’s time to clean up and try again another day.

April 14, 2023

Today started out with an already deployed deep cast where all there is to do is wait for the recovery so for the first part of the day was relatively uneventful. In order to pass the time I decided to test the UPS again. This is the smaller grey one that has a max wattage output of 300W. In order to get an approximate test I used 2 box fans of 100W each to make it a 200W test. Once unplugged the UPS lasted for 15 minutes and 53 seconds. This is decent, but not great. One would hope for at least 20 minutes but then again since this is such a low wattage it likely doesn’t need to keep things on for that long. 

We then did another C-Ops with Matt using a block this time instead of purely by hand. Interestingly I don’t think it helped much more and was quite a bit more of a hassle, but that’s why we tried it is to see if it was worth it. 

Today was my first exposure to a pumps deployment. It’s relatively similar to the PITS sediment trap but this time with pumps. We attached 4 pumps at varying depth to a vertically suspended wire and let them sit for 5 hours. 

Afterwards we did another CTD deployment and while we were waiting I worked on the UPS again. I did a quick test with the black UPS and a 1200W heat gun. This was a mistake however because although the black UPS is much more sophisticated and has a screen with settings, it doesn’t have the wattage output labeled and I had only assumed that it was over 1200W. This was not the case. A quick internet research showed that it’s maximum output was 700W. This proved to be a problem because that meant I had to go looking for different appliances that would ultimately add up to nearly 700W. Phone chargers only use about 20W, iPad chargers use 61W, laptop chargers can use around 1400W. All the things I found used either too little or too much power. Eventually I stumbled upon a “dusting fan” that uses 480W. Pairing this with the two fans would give me a perfect 680W. I also brought out a glue gun to test if the appliances I plug in do indeed use up 680W and if the UPS is rated to 700W output. I did this simply by plugging all the appliances in so the output power needed was 780W, and waited for it to give me an “overload” error, which it did. I then plugged in the duster and fans, unplugged the UPS, and immediately started the timer. Interestingly it only lasted 6 minutes and 41 second, which given the output might be good enough, but I was expecting at least 20 minutes. Because I don’t fully understand the parameters for power and time, I’ll be asking Rory additional questions to see if the UPS works or if it is faulty.  

Lydia is letting me off 3 hours early today so that I can catch an early morning production deployment, I’m not entirely sure what that means. 

April 15, 2023

Woke up at 5 in the morning to do a production deployment. Production is basically the measure of how much C-14 is consumed by the organisms in each of the flasks. These flasks were filled with sea water from the CTD at varying depths, and then injected with a concentration of C-14 and suspended back at those depths. 

Quick shallow cast CTD deployment to 1200. Oban let me do it myself today and said I also might be able to do the recovery. Everything went smoothly.

While we were waiting I went downstairs to help one of the scientists Rebecca with preparing the testing samples by putting filters on nozzles. 

Interestingly, earlier I had assumed that the CTD’s sensor data are what the scientists use for the individual sensor values. However, this is not the case. The scientists will measure the exact data from the water extracted at this depth and then calibrate the generated sensor data to what they measured. 

April 16, 2023

Got up early to observe the PITTS recovery. There were a lot of things going on at once, and everyone had to remain vigilant to make sure they didn’t get caught up in a line. 

It seems that the recovery might have taken a bit longer than expected, because with the following CTD cast, we seem to be behind schedule by at least 15 minutes. I think we have like 6 CTD casts today all back to back to back. A CTD deployment has a series of events that need to happen in concession with the other. First the deployment, you have to be on deck to deploy the CTD. Then you have to run all the way up to the bridge (3 flights of stairs) to begin communication with the CTD. After the scientist has finished the Niskin sampling and the CTD is brought to the surface, you then have to shut down the machine and download the data, then run all the way down to the deck to recover it. This is usually not tiring at all. However, usually there is time between the deployment and recovery, but today they are incredibly short casts. Instead of having one tech run up and down the stairs for deployment and recovery, we will be using walkie talkies to coordinate.

Today is the last day of this BATS cruise. I still need to get everyone’s information. 

Week 1: Flight Delay, CTD, Pumps, and Easter Break

Week 1 Arrival in Bermuda

April 2, 2023

Unfortunately, when I arrived in LA on the 2nd, my flight was canceled and I wouldn’t have been able to make it onto the connecting flight to Bermuda. The only flight that the airline company was able to schedule me on didn’t depart for another 2 days. And so I waited. Luckily the ship wasn’t scheduled to leave for another few days and so though I would miss the safety briefing I should make it for the first cruise.

April 4, 2023

Airplane departs at 11:50pm without any difficulties.

April 5, 2023

I finally managed to arrive and I came right when the staff was having an Easter party. There were games and prizes for different little events. For food there was traditional “Hot cross buns and Fish cakes” which I had never had before, nor would I think to have the combination of a sweet roll made with cinnamon and raisins and inside place a savory fish cake, but it tasted great! Lydia (Marine Technician) showed me to my cabin and said we’d be departing at 9am in the morning. 

April 6, 2023

Luckily even though I missed the safety briefing the day before, they still let me onto the first day-long cruise, and the first mate Emmy gave me a make up safety briefing. This included donning a full immersion suit made of thick neoprene.

This cruise was with BATS, and was only for the day. My goal was to get accustomed to the ship and its operations. There were two scheduled CTD deployments at 3450m and then again at 100m. 

The only problem that arose while on the cruise was the seawater intake pump filter got clogged. It was noticed by Matt, one of the scientists, who saw that the flow rate of sea water had significantly decreased. Oban, one of the marine technicians, knew exactly what the cause was, “the pump is clogged with sargassum seaweed.” When we went to turn off the pump and check the strainer, sure enough there was sargassum seaweed blocking the flow. It’s got small pneumatocysts that hold air. When chunks are broken off from the main organism they float to the surface. This is a problem for valves that intake seawater under the ship because the seaweed is floating at the top and will get sucked up instead. Once the algae was cleared, once the pump was turned back on we could see that the flow was moving smoothly again.

While we were checking the flow rate, Oban had noticed that the fluorescence of one of the sensors was significantly different than the other. Since the day was almost done he wrote it up in the to-do log to check on the next maintenance day. He mentioned that a good way to tell which one is off is to compare the values to the CTD fluorescent values and likely the one that matches is the one that’s accurate.

Once we got back to shore, some of the crew and I went to a local restaurant called “White Horse” where I got a ginger soda. 

When we got back to the ship, Emmy told me where the “soft” blankets are, and that there are a limited number of them so I should grab one while I can!

April 7-9, 2023

Apparently the marine techs have this weekend and Friday off, which leaves me plenty of time to rest up, adjust to the time change, and explore. 

Luckily one of the crew said that I could use his bike, and so I’ve been riding as far as my legs could take me. Rory also lent me some bus tickets for a bus that runs all over the island, though I’ve yet to come close to following the bus schedule.

P.S.

A lot of the people on the R/V AE have accents from all around the world, and I noticed myself inclined to mirror them. I remembered hearing that there’s a phenomenon that after you spend a lot of time with someone with a different accent you’ll pick up a bit of it. A quick internet search found that this is called the chameleon effect, and is a natural occurrence where we unintentionally mirror others in order to bond and feel safe in social interactions. So it stands to reason that I will eventually adapt an English, Australian, Filipino, and a swashbuckling West Country “Long John-Silver” concoction of an accent. I endearingly look forward to it. 

Pre-Departure Introduction

Hiya! 

My name is Brianna Roberts, and I just graduated from Cal Poly SLO with a BS in Ocean Engineering. 

Some of the hobbies I enjoy are playing guitar, Surfing, painting, hiking, and free diving.

I have been passionate about the ocean for as long as I can remember. Solving problems and helping the ocean are what I want to incorporate into my career. I have some experience working on boats for my senior project. We built and deployed a deep sea lander with a video and bait system pressure rated to 1200m.  

I will be leaving for an internship aboard the R/V Atlantic Explorer deployed off of Bermuda assisting professional marine technicians for all the cruises for the duration of the month of April and into some of May 2023. I expect to learn how to deploy the different equipment that is aboard the R/V AE as well as fixing and cleaning various components when needed. I am so excited to immerse myself into the role of a marine technician and make connections along the way. I hope that this will open the door to many opportunities in the future revolving around Ocean Engineering and discovery. 

Thanks to Maria Osiadacz for this incredible opportunity and to the people that have supported me to get here!

Week 8: Final Week aboard the Armstrong!

12/12

Final week of this internship! Despite being done with INSURV there was lots to do around the ship, many of which included cleaning up and reorganizing after the inspection. As the ship is going to be in port until the new year we took off the CTD and put it on the dock, where it will get taken away to have all its sensors calibrated. Most of the sensors need a calibration every year or every other year, and with the calibration log I worked on earlier in this internship it was clear all the sensors onboard needed calibration. 

The engineers are working on a project of their own, rebuilding one of the engines. This doesn’t overlap with the technicians at all, apart from needing to open a hatch on the starboard side deck. The hatch in question happens to be underneath the tracks for the CTD cart. So this meant for us, once we offloaded the CTD we started work on doing all the bolts for the track pieces that cover the hatch. Luckily the whole thing didn’t have to come apart, and we could get away with removing only about half of the track. 

This made for a great opportunity to pull off the gaskets beneath the tracks, they were extremely gross and caked with salt deposits, so one of my tasks of the day was scrubbing these gaskets.

My scrubbing was interrupted in the afternoon however, because of a small operation to bring the ship port-side into the dock. This was done to make life easier for the divers who were diving on the sea chest on the port side. Now, the ship can dock on either side, but they really prefer the starboard side as the decks have been designed with that in mind. This just meant for me, I had a very interesting time running the fiber internet cable from the connection on the starboard side all the way up to the focsle deck and over to the port side. Where there is a will (and enough velcro) there is a way, and soon the internet was restored! The ship will stay docked in this position while the divers complete their work over the next few weeks. 

12/13

Tuesday I finished scrubbing the gaskets for the CTD track, and I also re-labeled them so hopefully whoever has to resemble them has an easier time. After working in the morning on the gaskets, the deck crew was ready to bring on our wire baskets containing all the things we took off for the inspection, and the rest of the technician’s day was devoted to unloading the wire baskets and re-organizing everything in the hold. This proved a much more difficult task than taking everything off the ship, as we put everything back on we really tried to figure out exactly what it was, and if it was a back up that we needed to bring with us at all times. We were able to purge some extraneous equipment, but with the equipment we kept we labeled it obsessively and organized it much better than it had been. Part of being a technician aboard a ship like this, I’m learning, is keeping track of your processes and logging what you do, because you’re not on the ship all the time, the other technicians need to be able to figure out what you did during your time here.

12/14

The weather has gotten much chillier these past few days, but I found a great way of warming up, also an important one, cleaning all the hardware for the CTD track. This track is exposed on the deck to the elements and I believe the technician said it had been taken apart last year, only a year later it is already caked with salt and corrosion, as you would expect. My great task was standing over a sink running very hot water to clean all of the bolts and plates used to secure the track to the deck. This allowed me to stay in the relative warmth of the wet lab over a nice steaming bucket of bolts. Most bolts only needed cleaning with a wire brush, but some plates used to keep the track together needed some extra care with a wire wheel attachment on a drill.

Cleaning these little pieces took up most of my day, until we were informed about a delivery of a new lithium cabinet. This cabinet was deemed necessary by the Shoreside people as we have many tools that use lithium batteries. The battery containment unit is on wheels, but if you’ve been reading this blog you know that this ship rocks quite a bit, so a good part of the cabinets design is that it is intended to be able to put fires out on its own. As I understand it, the battery is placed inside the cabinet where the fire suppression system keeps it at bay. Of course, hopefully we never need to find out!

12/15

Thursday began very windy and rainy which was unfortunate for the new printers that have been delivered to the ship. They were out of their boxes already but wrapped with shrink wrap, so we believe not too much water got in, however these new printers are not the ship board technicians job to install. As I understand it Shoreside support will send people to install the printers, leaving us free to pursue other tasks today.

Emily and I moved on to removing some plumbing from the port side and contaminated sea water pump, which is all the way up in the bow thruster room. The corrosion on the plumbing for this pump was quite severe, and it took both of us to pry the pieces in question off. Once we got the pieces off, we sent them down to the deck crew for needle gunning and painting.

The next task of the day was taking apart the motor for the CTD track, which had suffered the same fate as the track itself (very corroded). An interesting detail about this motor is it appears to have as many as three different types of metal used on it, one of them being aluminum. We did finally get the motor apart from the driving gear, and the pictures will tell you how difficult it was!

12/16

Here we are at last, the final day of this internship. Unfortunately for you readers, it wasn’t the most thrilling of days, finishing up an internship like this has a lot of paperwork involved. Luckily it was a rainy day and no one was working outside anyways.

I want to thank everyone who has been reading this blog, and keeping up with my adventures! This internship has meant so much more to me than I could’ve imagined two months ago.

As I wrap this blog up, I can now say that part of the reason I had so much paperwork to do on Friday was not only the combination of the internship’s paperwork, but also I began the process of new employee paperwork! I feel so lucky and privileged to say that Woods Hole Oceanographic Institution has hired me on as a casual technician for the Armstrong. This will allow me to train with this ship’s systems a whole lot more and I will be joining them on a few cruises in the 2023 schedule. While I won’t be blogging those experiences, this internship has definitely reinforced the importance of noting everything that I’m doing, because the time really does fly!

Week 7: INSURV

12/5 

We began the week with three days left until the INSURV inspection, and everyone was running in high gear! In the morning I added the final coats of paint to the bullseye on the platform and Emily and I started working on fixing the gaskets for the CTD platform track. The track goes over several deck plates and hatches, and the gasket eventually gets displaced as the ship rocks. Putting it back into place just meant undoing the bolts holding the track, and (professionally) shoving the gasket back under. This also gave us an opportunity to work on the track itself, grinding down any corrosion and aligning the track pieces better. This, along with the motor rebuild Emily did last week means the CTD cart has never moved smoother! 

As rain came in for the afternoon, I shadowed Sonia as she updated any out of date workstations, which can be a delicate process for some machines that operate a specific version of Windows or Ubuntu. This is not a quick project so we busied ourselves with other minor projects for the rest of the afternoon while also babysitting the computers.

The weekend had a slight glum, after the cold weather and only short trips around town my car was dead! We went to the front desk of the Smith Laboratories to borrow a work truck to jumper it and the security guard there said “I’ll do you one better” Thanks!

12/6

The rain continued into Tuesday so we all continued inside projects, most of which included continuing computer updates and cleaning, yay! I worked off and on between checking for security updates on computers to cleaning down in the transducer room. The transducer room is vast so some deckies were cleaning down there also. They painted and dusted while I cleaned off all the tops of the transducers and transducer equipment, and also scraped off tons of excess masking tape on pipes. 

The big success of the day was removing the tape from the CTD platform, finally revealing my masterpiece, the bullseye!

This process was challenging for me technically to combine all my skills recreating the pieces and fitting them together, and then artistically painting the bullseye in Rustoleum so that it could be seen from the winch operator’s booth (since that’s who this is for, so the winch operators have something to aim for). Overall I think it came out great, and it gives everyone a laugh when they walk by!

We finished the day at the tech’s weekly meeting in person, where everyone wished us luck on the upcoming inspection. 

12/7

Final day before INSURV! The morning started with meetings for the SSSGs and then frantically finishing up all projects. For me this included a final round of cleaning in the labs and staring hard at all the SSSG spaces, trying to find things that had been missed. The crew worked so hard preparing for this inspection, the ship is looking spotless! 

I fine tuned my little bolt cover for the CTD, as the last one was too small by about 0.5 mm. This proved an exercise in frustration as the 3D printer decided for half my prints to stick, and half of them to unstick part way through. The machine cant be blamed for this (as much as I’d like to) and it just keeps printing as if nothing happened, leaving you with a wonderful ball of filament spaghetti in the end. Eventually I printed enough good ones to attach. 

12/8

Everyone woke early for even more last-minute preparations, but before we knew it, we had almost twenty Navy guys onboard setting up in the mainlab. In the briefing before we set out from the dock the Navy commander gave us a run down of which departments would work with which inspectors. They also explained that this team solely does inspections, moving around the country doing all the Navy ships. The techs were assigned one inspector who specialized in IT and the process began! 

We departed the dock at the 1030 slack tide, with plans to steam down into Vineyard sound for the propulsion tests. The INSURV inspector followed us around as Emily and Sonia explained how the network is set up onboard and answered his questions about the servers and router(s). It was very interesting to hear him compare the Armstrong to other Navy ships, we must seem tiny! The Navy guys were especially impressed with the food, complementing the stewards endlessly. The tech inspection finished quickly after he checked out all the server racks and printers, then we were free to lay low until our next test. 

After lunch the techs gathered back for a CTD cast, which was quite short because we were only in about 25 meters of water. The goal was just to demonstrate the operation of the LARS arm that deployed the CTD, and this was also a test for the termination I did, luckily the CTD operated well and my termination held! (losing the CTD in front of the Navy might have been the subject of my nightmares)

This concluded the inspection for the techs, and we got to relax a bit while the deck crew did more operations on the way back for slack tide at 1545. After buttoning everything up for the night, it was time to get some rest for the last part of the inspection tomorrow!

12/9

The INSURV team was back bright and early, continuing with the rest of the engineering checks at the dock. The techs hung out for any questions that might come up, but the only ones were helping the team connect to the wifi. The team then left before lunch without much fanfare, but during the crew debrief we were told just how well we scored and then the celebrations began. Overall the Navy sounded very impressed with the ship and especially the crew! 

I spent the afternoon fixing the only thing the tech department got dinged on, which was missing screws from the server racks, and easy fix. I then moved onto investigating an ethernet cable that had stopped transmitting, apart from the crusty corrosion on the termination, another bad sign was when I cut the cable and water started dripping out. Sonia helped me to find a replacement cable to run and I re-terminated the end to fit where it needed to. While we aren’t sure how the water got in the cable, the sun was setting and I lost the light to finish the project. 

Weekend plans no longer include a short cruise, as the wave conditions were forecasted to be rough. This just means we have a more relaxed window to set back up after INSURV. Another disappointing note is we wont be installing the new ADCP transducer this week either. While we had the transducer itself onboard, the parts for the elevator needed to lower it through the sea chest are not ready yet, so the project has been tentatively moved to February. I am disappointed of course, this install promised to be a great learning experience involving multiple departments onboard, working together to install a transducer without taking the ship to dry-dock. However I know Emily has other projects we can dive into this coming week! 

This by no means leaves us bereft of projects for this last week! INSURV gave us an opportunity to purge and clean, and this has unearthed several projects to keep me nice and occupied. 

Week 6: Inspections, 3D prints and CTD Terminations!

11/28

    We woke after the Thanksgiving holiday with a full crew again and lots of things to do! The techs first task was to test the .322 cable used for the CTD. This testing involved the use of a Megger instrument to test each wire within the cable for insulation resistance and a few other things.

The insulation resistance (as the name implies) measures how well insulated the wire in question is, and this mainly tells us how damaged each wire is. The techs test the cable before and after cutting it each time for re-termination, and the results compared to each other are how they gauge the health of the cable. A high insulation resistance reading means the cable is performing well, and a low reading (especially compared to a previous reading) means its probably time to re-terminate. 

    The techs re-terminate this highly-used cable about every six months or so, so when our readings were complete and to no one’s surprise, the numbers were a bit low, Sonia handed me the angle grinder and had me cut the cable. 

(The new end, taped up and ready for re-termination later this week!)

    We then all moved onto one of the biggest tasks, removing the hatch from the science hold to empty the space of all the SSSG equipment. The hatch was unbolted and wire baskets were lowered down!

We ended up filling five baskets with secondary and backup equipment! It took most of the afternoon but in the end it was great to get this task done at the beginning of the week while we were very motivated! 

11/29

    The weather prevented some outdoor operations, so we worked on inside projects like securing the cable runs in each lab space and taking down even more unnecessary runs. 

    The biggest excitement of the day was a run to Home Depot! Sonia and I used one of the WHOI trucks available to employees, (since the plywood we needed definitely wouldn’t fit in my car) and drove up to get some 2x4s and sheets of plywood to build a new platform for the CTD cart. Construction on that project will begin tomorrow!

11/30

    I began the long process of cutting all the pieces for the new platform. I use the term long, not because I had trouble cutting all the pieces out, but because all the pieces had to be fitted to their individual spots on the cart frame as I discovered none were interchangeable. Once I had all the pieces cut out I used an orbital sander to fine-tune the pieces and bevel the edges to fit close to the frame’s weld seams. This maybe was not the ‘proper’ tool for the job but with the roughest grit sandpaper I could make sure each piece fit perfectly without hefting a large saw around. 

    During the day most of the crew was occupied for an ABS (American Bureau of Shipping) inspection, the first inspection group to start our battery of inspections in the coming week. To stay out of their way we fitted all the pieces of the cart in and screwed them down, before adding the plywood and ensuring the new platform was stable. Unfortunately we had to take the platform apart for the next step in my process, paint!

12/1

    Today’s inspection was from the Coast Guard, so the techs again tried to stay out of the way by spending the morning securing more cable runs. If this sounds repetitive by now just remember I can only cut so many zip ties in a day before needing to move on to another project! Also you might be shocked at the sheer amount of cabling on a ship! 

    On a lighter note I was given a full tutorial on how to access the 3D printer onboard wirelessly and also spent time today fine-tuning my designs for parts the engineers wanted us to print. These were the outlet covers and end caps, and after a few re-designs I had two functional parts that can now be printed on-demand when they are noticed to be missing. 

    The only part of the inspection the techs were expected to participate in were the drills, these being a fire and an abandon ship drill. As we have practiced before, at the sound of the alarm we gathered our immersion suits (no one needed to put any on this time, thankfully) and life jackets and mustered ourselves in the main lab. A key to mustering for a drill is (in colder months) DRESSING FOR THE WEATHER OUTSIDE. When I got onboard it was stressed heavily in a real emergency at cold temperatures, evacuating in flimsy clothes and then freezing to death anyways was not the goal. The coast guard in a debrief later praised us all for being so prepared. 

    After the drill I embarked on the final step of the new CTD platform, the paint! This is an attempt to keep the platform from degrading with the repeated saltwater it gets on it. I say attempt here because we all know trying to keep saltwater out of places to prevent rot or rust is almost always an exercise in futility. In the spirit of trying to keep the wood from turning green and rotting beneath the CTD the techs told me to try painting it to seal it a bit more. After some research we learned that some types of paint we already had onboard, namely the Rustoleum, could also be used on wood! 

    This led us to conclude that the easiest and most efficient way of getting this platform done was to use that paint. I began by giving the plywood a light sanding with my friend the orbital sander, and going over the boards with a cloth to sweep all the dust away. I then covered both sides of each board with the Rustoleum primer, leaving them to dry for more paint tomorrow!

12/2

    Happy Friday! Thankfully we didn’t have any inspections today so I jumped right in with the first coat of white on the platform boards. I was told to let this dry for longer as the paint interacts with its primer and the interaction could be interesting because it was on wood. 

    Emily and I then moved on to one of the biggest tasks of this internship, learning that all-important skill of CTD cable terminating! We peeled back the layers of the cable, starting with the shielding layers that also act as ground, taking them back about two feet to have enough of the wires to work with. The cable has two layers of steel shielding which also acts as the cable’s ground, so two strands of this were preserved for attaching to the green ground plug. From here was standard wire terminating, stripping the wire, and blending the wire from the cable into the wire to its respective plug.

Emily then got down to showing me how to solder the wires together without burning the casing, then running layers of self-fusing tape, before adding final layers of vinyl electrical tape. This is done for all three wires encased within the CTD cable, then we added the ground connection which didn’t require soldering. All 4 of these new connections were wrapped with even more tape to attempt to keep as much water out as possible. 

    Both techs stressed that terminating this cable is something done often onboard research vessels, and every tech will have their own way of doing it. 

    We finished up the termination and celebrated! Many people were going home for the weekend so the next few days will be focused on indoor projects and organization. 

 

 

Week 5: End of OOI and Happy Thanksgiving!

11/19

Morning operations were successful as the mooring group recovered the last small coastal profile buoy, with its accompanying sensors and anchor. They also recovered an anchor that was left behind from last week. The wind picked up to a constant 30 knots and our destination that day had us steaming into the waves and pounding down for most of the afternoon. This influx of bubbles under the hull is a very big problem to say the least, as it disrupts the ship’s array of transducers. Not only transducers though, the constant supply of sea water being pumped for the main lab supply and to run through some other instruments was heavily disrupted by all the slamming. Emily and I worked to troubleshoot the PCO2 sensor which seemed to have an array of issues stemming from the interruptions in flow. We initially thought we were successful by replacing a drip sensor that had become corroded, but the system kept emergency stopping itself and the drip sensor was not the biggest problem. 

The evening was taken up by a battery of CTD casts, where we would steam (pound) north for half an hour, and then go out on deck and launch the CTD while trying not to get pummeled by waves coming over the side. In between casts I emptied and organized the cabinet in the HIPAP area, which was suffering from poor labeling and the internal lights for the cabinet were low on charge, making it very difficult to find anything. Many (most) things in there were networking pieces of technology I had never seen before, so I did have to bring Sonia in several times for the game of, ‘what is this and do we need to keep it onboard?’ This cleaning also doubled as a purging of equipment in time for the INSURV inspection, where anything superfluous will be removed from the ship. In the end, I was very pleased with the results!

(Also here is the promised CTD bolt cover final print!)

11/20

    The weather remained the same but the CTD casts were done in daylight today, which gave you more light to see the waves crashing onto the deck! 

    The evening brought a break from CTDs, as the EK80 was turned on for a long transect survey. Meanwhile Sonia started me on a coding journey, first showing me some resources to learn the basics, then setting me up with a virtual computer to test out what I was learning. This was lovingly titled “Intern Playground”, and it’s a place for me to get comfortable with a system similar to the ship’s, while also being safe from killing any of the ship’s systems.

11/21

    The weather gave us a break for the ROV operations, but not before giving us another taste of a bumpy night. Everyone was extremely motivated to finish up though, and the first dive of the day brought up the anchor claimed by the crabs last week. 

    The SSSGs had many meetings concerning an upcoming cruise in December, new ideas for upgrading the email system for the WHOI ships, and the upcoming ADCP installation after INSURV. These meetings ended just in time for us to go back into the main lab and watch Chris snag the final stubborn anchor. This one had fired off it’s linepack, but it had snagged somewhere on the way to the surface, so he had extra line to avoid getting tangled in with the ROV. This final anchor meant the last of deck operations, and the ship turned north to head back home. There were a planned group of CTD casts along the way, but the weather had turned against our favor and by the middle of the night, CTD casts were called off.

11/22

    No one got much sleep as the ship rocked and rolled its way back to port. I was personally attacked by all the items on my desk, in my vanity when it swung open and emptied all contents, and my desk chair when they all went flying during various rolls. I did not, however, fall out of my top bunk, which is an accomplishment. 

    No sleep and a bumpy ride makes for a low-spirited crew, but everyone was bolstered by the fact that we accomplished all of the OOI array goals, picking up all of the equipment and doing many CTD casts and surveys along the way. We came into the dock at WHOI around 0900 and quickly the deck and science crew began unloading. 

    As with the last demobilization days, the SSSGs mainly stick to going through end_cruise  work, moving data to the correct places and shutting systems down. This involved the techs all together to figure out what was wrong with the PCO2 sensor. In the end it was a drip sensor that kept stopping the system, but because with all the air in the systems from the ride, the pressure differences caused spontaneous releases of sea water in weak places in the tubing system.  

    The end of the OOI cruise doesn’t mean an end to the work, as now we can fully turn our attention to the INSURV inspection. This meant for these days leading up to the holiday, zip ties were our best friend, as we have to secure all cable runs. This is just one of the many steps for the SSSGs before INSURV, and all other departments on board will be working through the next week and a half painting, cleaning and securing.

11/23

    Our first full day back on shore was a busy one as the demobilization efforts continued. All the moorings and associated equipment are removed, as none of it can stay for the inspection. Speaking of inspections, many different aspects of the ship need to be looked at, including the fume hoods in the lab spaces, and the hull itself, as we had snagged a lobster pot on our bow thruster on the way back. (No there weren’t any lobsters, we asked.) The divers also exercised the bolts on the sea chest plate. You may say this sounds like a lot of exercising for this project, but they take opening holes in the ship very seriously. For our purposes we aren’t opening a gaping hole to be exact, but the outside plate of the sea chest will need to be removed if we are to install a transducer on an elevator and don’t want to hear it go ‘bump’ on first deployment. 

    On the topic of the new ADCP transducer, one of the scientists on the team stopped by in the afternoon, and the techs met with her to discuss the install. For a few days the team had been emailing back and forth about an issue with the cable bend. After discussing many solutions over Zoom, this scientist who visited agreed that the cable bend was not ideal, but likely workable, as the instrument is only planned to be onboard the ship for a year of at-sea testing. For us this means we can continue with the installation plans, as again, we can’t start this project and have it unfinished during INSURV, so it must be started directly after.

11/24

    Happy Thanksgiving! I am fortunate to be spending the holiday weekend at home, and I hope everyone has a great holiday and eats lots of good food!

I did bring a small project home with me, modeling out two more small parts, one to cover a missing outlet (think a protector you have for a baby, but for a hollow outlet strip) and the end cap for those strips of outlets. I will update progress on the parts next week!

Week 4: Finishing OOI Leg 1, Jumping straight into Leg 2!

11/12

    After steaming all night up to Martha’s Vineyard and stopping to do CTD casts the whole way, we arrived to a beautiful day dawning in the Vineyard. It was a rolly steam through the night, so as this was a day off the OOI site, many people (including me) rested and caught up on sleep. 

11/13

    After the storm passed, we steamed back to the site. I worked on odd jobs around the ship while the rough seas prevented the scientists from doing any work. In the main lab there are several power strips mounted which needed to be replaced with ones that the Navy approved, and down in the science storeroom there was a lot of organization of the cables and spare nickin bottles that was badly needed.

(I realize I dont always post a before and after to the organization I’m doing, but it’s just too many pictures, so just trust me when I say it looks a whole lot better)

In the afternoon Emily and I touched base on what I’ve learned so far that I’m feeling strong about, and what I would like to learn more of. In the next few weeks I would like to delve deeper into the computers that run all the ship’s various transducers and how they all interact with each other, as this is essential for understanding a huge portion of the tech work done onboard. 

    Later in the afternoon during a calm spell the science crew launched a small drifter off the stern. The little drifter is named “Lady Lance” and the original has already made the transit from the US to Ireland. Students at a local school have built a sister to the original boat, decorated it, and mounted a new GPS tracker to watch as the currents hopefully take the boat back across the Atlantic.

The evening hours were filled with more CTD casts, where the team and I running them were feeling good despite the rough conditions. This was only made better by the display of white-sided dolphins, who were feasting on a school of small fish right next to the ship. As we did our casts the dolphins put on quite a show! I ended up getting splashed from the waist down on one of the last casts of the night but I couldn’t feel very upset about it because of how amazing it was seeing the dolphins!

(the best picture I could get)

11/14 

    My schedule for this week has been a bit wonky, so lately I have been skipping breakfast and getting up for lunch. This morning however I heard a great commotion in the hall. I learned later this was a stow-away drill going on, and the crew and scientists were gleefully hunting down a single engineer who had been chosen to act as the ‘stow-away’. 

    In the afternoon the scientists had scheduled another mooring recovery, and Emily and I geared up and headed out to watch the operation. The bosun was good enough to let me run the A-frame, which turned out to be uncomplicated, but very fun to operate. For this operation the scientists had brought their own winches, so all I was doing on the A-frame was raising the mooring on the pulley attached to the center of the A-frame and then lowering it on deck. Of course it’s never just the mooring, and we stayed through the whole operation collecting the subsurface flotation, profiler and anchor. 

    Speaking of anchors, the science crew was also gearing up today for the ROV operation to recover the anchor that was stuck, as the weather was only supposed to improve more. Sonia and I tested the Sonardyne nano transponders, of which the scientists have two, by charging them up and strapping them to the CTD, and sending them down with the cast. We lowered the USBL pole and were able to track them as they descended. This obviously is a good idea, as no one wants to deploy the ROV and not be able to track its position during the operation. All was well there and as we only had a few casts to do this evening, I turned my attention to other projects. 

    The ship is full of cameras to monitor the systems and machinery, and the camera in the transducer room had apparently not been working for a while, so I went down to check it out. I determined the camera wasn’t working because it wasn’t plugged in. But how to plug it in? The camera is mounted to the ceiling of the transducer room and the ceiling is perhaps 15 feet high… and I am very short comparatively. Even standing on the tallest transducer I am still lacking the height to work on the camera, more to come on this project as we figure out how to get up there. 

    To feel productive after I couldn’t make progress on the camera project, I spent a good chunk of the evening organizing the ‘random hardware’ drawer in the science storeroom. I sorted through all the bits and bolts, and now the drawer is ready for new dividers to keep everything organized and accessible. Now on an organizing streak, I waited for the main lab to clear out of scientists for the night and then organized the drawer of tools in there. This may all sound like typical intern work, but I actually appreciate it not only for the satisfaction, but also with how it forces me to be familiar with the layout of the ship. 

    At the end of the night Sonia gave me a run through of the Ksync system, which is just a computer program to sync multiple transducers to ping at intervals where they won’t interfere with each other. The main culprit here is the EK80, which is very susceptible to interference from other instruments, so much so that we ask the bridge to turn off some of their speed and wave tracking instruments while the EK80 survey is underway. The Ksync program will take control of all the instruments and time each to ping sequentially. This ensures the best quality of data from the EK80, which gives the most fascinating look at the water column! The scientists explained the data we were seeing was different water currents as they flowed near to each other, but different enough in temperature and salinity they weren’t mixing. It doesn’t hurt either that the data is shown in rainbow colors, so it’s very visually appealing.

11/15

    I woke up for the big event of the trip, the ROV operation to recover the mooring anchor that was lost earlier when the recovery line broke. During the night we steamed in a rectangle for an ADCP survey, and then stayed on station above the last location of the anchor until time to launch the ROV after breakfast. We had a perfect day, with only 1.5 meter waves and calm winds. The techs don’t have a ton to do directly with this operation, but as usual they act in a support capacity, ensuring the video feeds from the ROV go to the correct places and the USBL pole is deployed so the Sonardyne Nano transponders can talk to the ship. Something that I didn’t know about this specific ROV is that it is made by Saab! The OOI group use it with another contraption called a ‘parking meter’ and each has a nano transponder so operators onboard can know the exact location of both. The parking meter is used as a spool for the line used to attach to the anchor, and also to take the tension off the ROV itself. The ROV then has about 25 meters of cable to explore, and if more exploration is necessary, once the ROV and parking meter are at depth the whole ship can move to let the ROV then drift into a better position. 

    The mission went well and the anchor was found close to the last known waypoint. It was amazing to watch the ROV go down to nearly 500 meters, through darkness and particles of organic matter and see the anchor sitting on the bottom! The ROV clipped on to the anchor, and despite protests from some crabs, made its way back to the surface for recovery. However when attempting to recover the anchor with the newly attached line, the clip came loose, and so we started the whole operation again in the afternoon. It seems those crabs were very fond of that anchor!

    Funnily enough (but not for the ROV team) after finding the anchor again in the afternoon and clipping on, the same thing happened. It was a common joke that the crabs had been unclipping us because they made the anchor their home. Whatever the issue, we couldn’t stay on site anymore, and at 1900 we began our steam north back to WHOI. With the weather we no longer have two to three days in port for demobilization before leg two, now we are coming in for just shy of 24 hours and leaving again on Thursday. 

11/16

    The day began early, arriving at the dock around 0930 and immediately the deck crew began offloading the mooring equipment. The techs mostly stay out of the way of these deck operations except for the important task of connecting to shore internet! Emily then walked me through several of the end-cruise computer tasks like ensuring the data collected is copied to the correct places and everything is turned off and logged as so. As we did this a diver came and dove on a sea-chest where they will be installing a new transducer in a few weeks. The ship is not going to dry-dock, since it has a few spare sea-chests with no transducers installed, we can put this one in without having to pull the ship out of the water. The diver was investigating how difficult it would be to take the bolts off the plate covering the sea-chest, and after he was done we went down and exercised the seacock, which seemed to turn very well (we had expected the valve to be frozen and possibly immovable). 

    We took a field trip to shore to collect various parts and tools we ordered in the past week, and also a surprise! The new transducer that we will be installing was waiting for us! The transducer has been in a lab being tested, and has now finally come aboard to be mounted. The issue is the transducers need to be mounted below the ship’s hull, and obviously we cant do that without going to dry-dock. The solution to this is mounting the transducer on an elevator attached to the sea-chest. When everything is installed and working properly, the seacock can be opened and the transducer can be deployed down below the hull via the elevator, similar to how the USBL pole operates. 

    One of the tech gurus from shore then came aboard to demonstrate how we test the transducers for the various instruments. This is a long and frustrating process, as each instrument has multiple transducers for sending and receiving signals, and each must be plugged in and tested individually. The testing today was just an example of what we would eventually do to all of them, and after some issues were found with the computer connected to the transducer tester, we determined this was not a project for the limited hours we were in port between these legs, and moved on to other projects. 

    Emily and I then joined a meeting on zoom about this transducer we would be putting in. It was really good to finally put faces to names I’d been seeing in email chains! The meeting was mainly focused on the logistics of installing the transducer elevator, which is in the process of being machined out and will need to fit down a narrow shaft to the transducer room to be assembled. As you might imagine, the dimensions of the shaft and the weight of the parts are the major limiting factors, as well as the fact that the ship is still slated for a Navy INSURV inspection in early December. This means we can’t begin the installation project until the inspection is finished, shortening our install time window significantly. For me it will be an excellent opportunity to help the techs on a larger project that involves many aspects of WHOI personnel. 

    We saved the best project for last, testing the new workboat! This was a very essential project which for the techs, involved getting in the old workboat to provide a comparison to the new one. Safe to say, the new workboat has twin 120 hp outboards, while the old one has twin 60 hp outboards… I’ll let you guess which boat won! 

(For those of you wondering, no they didnt let the intern drive the expensive, new workboat, not until the Captains got to test it out! Maybe next week in port!)

11/17

    Our time of departure this morning was scheduled to be 0950, but the mates onboard  the ship must perform Gear tests within 12 hours of coming into or leaving port. Today I was invited up to the bridge to run through the tests with our 2nd mate, Chris. The gear test just involves a full test of all maneuvering devices, from the engines to the thrusters, and a test of all the control stations on the bridge, of which there are three, center and each side station. He was able to explain some more of the ship’s systems, including the DP (dynamic positioning) system used to keep the ship in place within a few meters of a specified position. This means that the ship hardly ever has to anchor! 

    As we left the dock for this second leg of the OOI cruise, I finished washing all the plumbing for the transmissometer and PCO2 instruments, which will get gunked up after only a week or so of running. We are again running the stern diaphragm pump for the uncontaminated sea water as the scientists don’t want the creatures taken up by the pump to be in pieces. 

    My schedule for this week’s leg will be similar to last week’s leg, and I went down for a nap to wake up in time for dinner and the night’s first CTD casts. The casts for this week involve much more time, as these scientists are collecting massive amounts of water samples. We had about 90 minutes between stations, perfect chunks of time to work on this blog! 

11/18

    The first full day of this second leg opened with CTD casts early in the morning, thankfully there were enough scientists who got up which meant I didn’t have to. They also started mooring retrievals early so by the time I got up they were on their second retrieval of the day and had already had an anchor release malfunction. The weather for the coming week is looking windy and turbulent (spicy), which will make ROV operations difficult or impossible depending on the severity. This has caused a majority of the cruise to be left to day-by-day planning, and sometimes hour-by-hour changes. The scientists have set objectives, such as recovering all the small coastal profiler buoys and anchors, along with all their set CTD cast waypoints, and all of these events are now up in the air schedule-wise.

    As we steamed out to a different station for more CTD casts and samples Emily set me to designing and printing my first part on the 3D printer. This has always been a fascination of mine and I’m so excited to start learning how to print things! My first lessons in 3D printing went something like these:

Errors in printing can come in many forms, starting with your design and ending with the printer itself, so mistakes are practically inevitable. I was attempting to make a small cover for a bolt on the CTD where a lanyard for one of the niskin bottles gets caught some of the time. The final version is printing as I get ready to post this blog, so you will be updated next week hopefully with the part in place!

Week 3: Leg 1 of the Final Coastal Pioneer Array OOI Cruise

11/7 

    After a relaxing weekend at home, I returned to the ship, rested and ready to work! This week began with prep for the upcoming OOI cruise. The main lab hadn’t seen any scientists for a few weeks, so we began cleaning and organizing the space, and plans were made to make some of the tools more accessible to the scientists. We took a field trip to the Smith lab, where all ordered supplies come in for the techs to pick up. 

    I then spent my afternoon putting my recently acquired knowledge on terminating coax cables to use, helping to terminate the new cables for the main lab. Sonia and I terminated for what felt like hours, and finally at the end we had six new cables to run the length of the lab. 

11/8

    We woke to an issue with the pCO2 system, all tests indicated that the systems were fine but that it was an issue with the server. After running all the logical tests, the system fixed itself and we were left wondering what went wrong in the first place. An issue for the future! 

    Sonia and I ran the new coax cables in the main lab and over to the new J box. The science crew started to move aboard and the lab setup began. The techs and I continued with random tasks for the rest of the morning, purging broken equipment (chucking it into the dumpster) and working with the CTD track motor (confirming that it still needs to be rebuilt in the winter). After all this excitement the techs and I attended the weekly SSSG meeting in person. Its nice to finally put some faces to the names I’ve been seeing over Zoom! 

    I closed out the day by helping troubleshoot issues with the ship’s camera system, starting with the one at the top of the A-frame with Emily!

Luckily I’m not afraid of heights because two stories up may not seem like a lot from the ground, but it certainly does while you’re up there! We continued troubleshooting the cameras for the ROV people and ended up doing more terminations of coax cables that were thought to be fine, but under closer inspection were looking shifty. 

11/9

    The ship had to wait for a slack tide to leave, which meant we had time for some last minute errands on shore before departing close to 1100. The techs had me work on some of the starting cruise procedures, including turning on the ADCP, the 710 multibeam, and lowering the SSV probe (this time without shearing off any screws). We initially had issues starting the Knudsen echosounder, and were more confused when everything checked out fine with the servers and the Knudsen itself, after some thinking it turned out to be a harmless permissions issue. This was easily fixed by logging off, and logging back in on the account with the correct permissions to run the Knudsen. The techs and then I joined the science crew for safety and abandon ship drills. 

    One of the many great things about this internship is how flexible it is! The techs asked me what area I would like to observe during this science cruise, we had been told that most CTD casts would be done at night, so I asked to be put on a night ‘shift’. I was not strictly in charge of anything but I got to stay up with the tech on duty and work independently when there were no issues, and jump into action with them when something came up. After showing me the launch and recovery procedures for the CTD, the techs left me to it along with a grad student from the science party. 

As the mission was outlined, this first week-long leg would be to recover the three large surface buoys and their anchors, and most of the gliders for the array. For a glider recovery, the scientists are able to tell the glider to stop and come to the surface, then those coordinates are sent to the watch officer who then takes the ship to that area. What follows is everyone looking around for the single, small blinking yellow light on the glider, which is pretty hard to spot at night or in the day! The glider will have some kind of line or attachment point for someone on deck to hook it with a line attached to a crane to hoist it up on deck and safely into a cradle. This is considered to be a relatively easy recovery, as in, not requiring the A-frame and multitudes of lines as is needed for the larger moorings, hence why many of the glider recoveries were slated for the evening. 

I began my first evening shift with the first glider recovery, which came with a small school of Mahi,

…and then my first CTD cast! The grad student, Lukas, and I worked well together and were able to do several casts before the midnight EK80 survey. 

11/10

    I slept in through breakfast this morning, but caught lunch and started my day prepared to be up late for my shift. While I slept in they recovered a large surface buoy and its accompanying risers. By the time I went out on the deck to watch, they were on the last stage of the mooring recovery, pulling up the anchor! This ended up going a bit awry, with the recovery line breaking part way through pulling up the anchor, meaning an ROV mission is now needed to reattach the anchor. 

    I joined the tech meeting in the afternoon before the OOI crew recovered two more gliders, and did more CTD casts at each site. Meanwhile I continued my catalog of the CTD sensors, now figuring out the calibration dates and which ones are past due. 

    With the upcoming hurricane Nicole, plans are kept flexible while the crew watches the storm, expected to hit us Friday night into Saturday. Ultimately it was decided to head back north to Martha’s Vineyard to hide while the worst of the storm passes over us. With the adjusted schedule, Lukas and I were able to complete many CTD casts for his research again, stopping at midnight for an EK80 survey. 

11/11

    Another morning, another buoy recovery! This time I made sure to get up early to see it happen though. It is amazing how small these things look out on the water, but on deck you could open the hatch and climb right inside! The deck operations for the recovery are very interesting to watch, as this group has sailed on this ship for maintenance on the OOI array nearly every six months, they work like a well-oiled machine, carefully capturing the buoy, leading it up with the A-frame and then gently guiding it on deck and into position for the transit back. 

    After a nap I woke to hear that the recovery of this buoy’s anchor went better than yesterday’s, and with the change in plans due to the hurricane the ship steered over to pick up a smaller buoy in the vicinity before heading north to Martha’s Vineyard. These smaller buoys were mostly slated for the second leg of this trip, but with the interference of the hurricane (now downgraded to a tropical storm thankfully) it was determined that we might as well do what we can with the time out here we have. 

    As I post this I’m looking forward to at least six more CTD casts tonight while I’m on watch helping out! 