Florida on the R/V F. G. Walton Smith

I will be leaving for Florida on the 18th of June; right now I am making sure I have a list of things I will need while on the internship. I have emailed back and forth with my host and have a good idea of everything I will need. I want to make sure I am prepared as I can be and am professional.

I consider myself very fortunate to be going on this internship at sea, and I am very excited to progress more as a marine technician and to experience working at sea. There will be three seperate research cruises I will be a part of – they offer the unique oppurtunity to broaden my knowledge and skills of various marine technical work.

In the days to come, I will be making sure that I have everything I need. Hopefully, I will not forget anything too important!

-Wolfgang Irrig

Week Four on the R/V Sharp

This week on the Sharp seemed to fly by, as I was kept busy with a lot of time on deck. I can say that every time I work with the crew, there is always a problem to solve, and I always learn something new. Last Saturday was a great day, where I continued to monitor the multibeam, as well as perform other tasks to benefit the techs like going online to get brochures for all of the sensors onboard and making a new winch calibration table. I was even able to teach KG a few skills in Microsoft Excel that I had learned in some of my science classes. The CTD winch was fixed, so we could continue to do casts. There were frequent issues with the habcam not outputting video, so we decided to pull it up and spend the rest of the cruise dredging. Unfortunately, there was a long steam to the next site, so the work would be left to the other watch. Sunday was even nicer (if that’s possible), a beautiful day to prep the boat for coming in to port at Woods Hole, Massachusetts. I washed all the sand off the deck and then KG taught me a little about dock lines and the way that we set them up on the Sharp. We passed land masses such as Nantucket and Martha’s Vineyard, while seeing much more activity and boat traffic. I was the first one on the boat to jump to shore, as I got off to secure dock lines and the gangway.

I got the rest of the day off, and went out with two of the mates and KG to explore the town, which I had never been to before. It was quite gentrified and touristy, and I was blown away by the high prices at the restaurant we ate at. When we returned to the boat, a few fresh crew members (most of whom I sailed with on the first leg) joined us to load food. Monday was cold, raw, and rainy, as we said goodbye to some crew members, like Pam, Jonathan, and KG, and picked up some new ones like Christian, Paul, and Captain Jimmy. We put fresh linens on beds, cleaned science rooms, and helped scientists secure new equipment like tanks and chillers. The engineers noticed that our holding tank was nearly full, and we would have to find a way to pump it out. I was surprised at what we did next; the solution was to move the boat a quarter mile down the harbor to use a pumpout station, then move it back to our slip. That is what we did, which I found fun because I like line handling and wanted to get more practice with it on a large vessel. Once this was done, I got the rest of the day off, so I took a much needed run to stretch out my legs and explore a little more.

Tuesday was departure day for leg three, as Christian and I worked to continue to secure the boat. I handled lines again for the departure, started up the flow through system, and calibrated the SMS. Wednesday was nicer but moderately rough, where dredging began in full force off Cape Cod. Every third dredge, we did a CTD cast, which is becoming routine now thanks to KG’s instruction on the previous leg. It was interesting that every dredge resulted in different substrates and organisms, some full of sand dollars, some with rocks, crabs, sea stars, and some with scallops. We ran into several problems along the way, such as rocks tearing dredge nets, causing us to have to use the crane to swap out the dredge for a spare so science could work on repairing them. Also, Casey, the second engineer, noticed that the ramp on the stern of the boat used to lower the habcam in to the water was bending under the strain due to a corroded frame. We discussed the possibility of an emergency stop in a port to weld it properly. I also got sight of more humpback whales, some within just a few meters of the boat (amazing pictures to come)!

Thursday resulted in more dredging, trying to finish up stations before we decided to make the emergency stop the following day to repair the ramp. One of the dredges was full of scallops, and Christian, Casey, and I saved a few buckets to shuck between tows. I’m not tired of eating scallops yet! We saw more cool organisms like hagfish and a few baby octopi, which we kept in the tanks. Dredging finished with a few hours left of our watch, so Christian and I hosed down the deck, secured the table, and raised the keel to prep for the steam back.

Today I woke up to catch a few lines, as we were back in Woods Hole again. I took a nap after this to attempt to stay on my watch routine of noon to midnight, as this was to be a quick turnaround. After lunch, I went to work, helping Sean, Casey, and TR, a deckhand, lift the ramp with the crane, grind corrosion off the bolts that hold it in place, re install the ramp, and tighten it down. By mid afternoon, we were done with the job. I was helping clean up the tool room and get the boat ready for sea again. I undid lines, started the SMS, and we were off to the habcam sites with a solid deployment ramp. This was to be a long steam out to the beginning of George’s Bank way off Cape Cod, so I had some down time on watch to read and prepare for more work ahead. I also got a chance to talk to Jimmy on the bridge, who told me to keep in touch with him once I got off the boat. As a job crewing a research vessel is definitely appealing to me, I told him that I definitely would. Soon we will be well out to sea to collect more data. Until next week!

 

Huxley

 

Pictures from Scallop Leg 2

/files/marine/files/img_0773.jpg : Tied up in Lewes, DE

/files/marine/files/img_0777.jpg : Leaving Lewes Harbor

/files/marine/files/img_0783.jpg : We steamed north past Cape May, NJ

/files/marine/files/img_0799.jpg : I spent much of this leg operating the multibeam snoar, that reveals a map of the elevation of the ocean floor 

/files/marine/files/img_0809.jpg : We steamed past Block Island and its new wind farm

/files/marine/files/img_0812.jpg : The storm we navigated through

/files/marine/files/img_0816.jpg : Scallops!

/files/marine/files/img_0819.jpg : In some dredges we caught hundreds of scallops

/files/marine/files/img_0821.jpg : In others we caught boulders

/files/marine/files/img_0825.jpg : Massimo, one of the scientists, myself, and Jonathan, the engineers, collected sediment with the grab sampler

/files/marine/files/IMG_0829.JPG : Who needs a whale watch?

/files/marine/files/IMG_0835.JPG : Sunset at sea

/files/marine/files/IMG_0841.JPG : Welcome to Woods Hole, MA!

/files/marine/files/IMG_0842.JPG : The R/V Armstrong, the research vessel for Wood’s Hole Oceanographic Institute

/files/marine/files/IMG_0846.JPG : The Sharp tied up in Woods Hole

 

Week three is a Little late

Now that the third week has come to a close and one half of my time aboard the R/V Atlantis is just about over I can really get a sense of what life is like working on a research vessel.  First off any standers of a normal workday are gone.  As one of my fellow Alvin workers said it best “everyday is like a Monday.”  We wake up early every morning barely coherent, look for that pot of coffee and go through the same routine.  With no weekends off and always have work to do you would think that this would make this life style unbearable but it is just the opposite.  For everyone out here the benefits out way the cost.  The biggest problem we’ll face is not the when the sub decides to misbehave but it is time.  When you’re working with a piece of equipment that is designed to withstand more then 400 times the pressure of earths atmosphere.  Along with having to have the sub ready every morning promptly at 7:30 so the science team can go down and collect the samples they need, time is not really on your side.  Though we have been very fortunate this cruse that there have been no major issues with Alvin, even something as simple as an unwanted ground in the electrical system can set us back.  When working in this type of environment the biggest key to success is work cohesion.  Being able to get along with your coworkers is so important in this filed because you have to spend so much time together under high stress situations.  As an intern the first thing I learned was to know when it was time to get in and help out and then when to get out of the way. 

 

We have had 16 consecutive dives now with 21 total dives schedule for the science cruse.  Keeping track of day-to-day events has been getting harder because everyday is the same thing and at this point it all starts to mix together.  One day can feel like a lifetime but one week can feel like a day.  Despite this I am still enjoying my time out here, I love the work and I’m enjoying the people.  We are all quite literally stuck in the same boat.  As the science cruse is coming to an end we are expected to be arriving into port either the 10th or the 11th.  Once then we will say our goodbyes and head back out for the engineering segment.  There are only 4 dives planed for the engineering cruse, were we will be diving to the subs current maximum depth of 4500 meters (14,763 feet).  For a better example most naval subs cat go below a 1,000 feet (304 meters).  At the depth of 4500 meters you will be experiencing 450 atmospheres worth of pressure.  With experiencing 14.7 PSI (pounds per square inch) in one atmosphere, Alvin will be experiencing 6,615 PSI at 450 atmospheres.  Once the engineering dives are over I will be staying on the ship for the 2-week cruse back to Woods Hole Massachusetts.  I am not quite sure what jobs they will be having me do during the transit but I know I will be put to work.

 

Now on to the more interesting topic of what did I do this week?  I am getting this blog out a little late again do to a network failure on Sunday and a series of unfortunate events on my behalf Monday night.  The week started out just like any other.  On Tuesday we had to take the battery that I have been working on out in order to begin cleaning of the battery hold for ship inspection.  The cleaning didn’t start till Thursday and lasted over into Friday.  Thursday was game night on the ship so a bunch of us got together and played some card games.  On Friday we had gotten to a new dive cite and this one was only around 400 meters deep witch is very shallow for this sub.  Strangely this became problematic because all the connectors on the sub are meant to perform at more extreme depths.  We ended up having to deal with a ground in a cable witch was caused by a small amount of water making its way into the connector.  We thought we fixed the problem the night before but the ground returned the fallowing morning and we had to postpone the dive till 11.  These problems continued and on Sunday the sub had to surface half way through the dive because we got a ground in the hydraulic motor connection. This completely prevented any used of the mechanical arms on the sub so the dive could not be completed.  We were able to quickly fix the problem and get the sub back into the water only 30 minutes later.  Sunday night we got a massive storm witch prevented any use of the network and with the only free time I have is at night I could not get the blog out then.  On Monday we moved the batteries back into the hold and I got to work prepping them for final assembly. Once returned one of the subs cameras stopped working and we’ve begun working on fixing that.   Monday night we begun transit to a new location and just as I was ready so send my blog post the ship changed heading and blocked the satellite dish once again taking down the network.  Tuesday, today I had finished prepping the batteries and we are planning to start assembly tomorrow.  That just about sums up what I did for the last week.

 

I also want to say I was suppose to have some images in the last blog posting but didn’t due to a complication wile up loading so I’m going to try again tonight.  If I cant get it to work I will post the images separately in an few days once we get back to port. 

Beautiful Deep Sea Discoveries- Photos Galor, A MUST Read!

          

The back of our computer control panel       Can you spy Wilma? She made it and was set free!

-or as I like to think- my wire castle.

PC: Jason Bradley

                    

Brittle Star                                 Sea Cucumber- ventral view                 Glass Sponge

      

  Stone Coral                               Translucent Sea Cucumber                     Flat Worm

 

 

                

   Stalk Anenome                       Translucent  Sea Cucumber                Squat Lobster

Week Three on R/V Sharp

This week was quite interesting, where I got a chance to see many different operations and learn a lot from KG, the senior tech onboard. The theme of this week was encountering a steady stream of small problems, as opposed to several larger issues onboard the previous leg.

Last Saturday, a very nice day, the scientists continued to tow the habcam near Long Island, close enough at one point that we could make out houses on the beach, so most of the crew headed up to the bridge holding their phones in the air trying to get service. We started the multibeam up again, but had issues with the computer freezing, so we opened up the unit and reset a chip which seemed to solve the problem. After a crash course from KG, I was operating the multibeam sonar on my own, adjusting settings as the bottom changed and sending profiles of the bottom to the scientists. I also installed a new camera on the stack pointing towards the dredging area, where I learned how to terminate the cable and secure connection points with splicing tape.

Sunday came with more multibeam and more freezing issues, so we took some screenshots of the issues and KG sent them to an expert on shore. I was assigned the task of writing up a procedure pertaining how to start up and operate the multibeam to help out future techs and interns on the boat. When I did my daily check of the SMS system, I noticed that the temperature and humidity were way off. We went aloft and opened up the sensor, which had water inside, so we replaced it with a spare that we had onboard. KG stressed the importance of always having spare parts while at sea. Monday started with me being awakened by the crash of pots and pans in the galley; another rough day at sea. We were on the high seas, 50 miles off Nantucket, getting prepped to start the first multibeam survey of the canyons for suitable juvenile lobster habitat. It was very difficult to watch a computer with all of that rolling, so I terminated more ethernet cables and worked with KG to learn the model numbers and names of CTD sensors.

The multibeam was having issues finding the bottom due to the contant pitching of the ship, and on Tuesday we eventually pulled out the habcam, which had a ripped open termination and a point in the fiber optic cable where some of the strands had come unlaid. We cut the cable past that point so the scientists could work on a new termination, a long process that could take more than a day. So instead we headed to the first dredging site, where the science wanted to run a CTD cast to obtain water quality data at depth. KG showed me the process and walked me through the entire thing, from setting the device up, dropping it in, recovering water samples, and recovering it with the winch. Once this was complete, we began dredging, going through the motions of launching and recovering the large, rusty dredge, then jumping on the table and shoveling our catch to the scientists who sorted out the organisms they wanted. Up here, our catch was much different than the southern leg, with much less sand, more mud, and WAY more scallops, as well as flounder and mean looking goosefish. Between dredges, KG, myself, and Jonathan, one of the engineers, shucked scallops for the cook. It was worth it, because the next few days we enjoyed great meals like bacon wrapped scallops and scallop ceviche.

Wednesday was foggy but much flatter, and we came out on deck to find a winch we need for dredging leaking hydraulic fluid. All we could do was wrap it until we got to port and hope it doesn’t get worse! We did a few more CTD casts between dredges, and KG let me operate the computer controlling the CTD. He also showed me how he processes the data, and let me explore the program that cleans up the data and produces nice looking graphs. Dredging became more tedious as we mostly recovered rocks, some quite large, that we had to pick up or roll off the table. During one of the haulbacks, there was a break in communication and I left a line tied down that ended up snapping off a cleat. It was not a critical piece, though, but it’s always important to know what is happening on deck! On the last dredge of my watch, I talked to Sean, the relief captain, up in the wheelhouse, who showed me how he maneuvers the boat during a tow. It was a long day, but I learned from a lot of different people!

Thursday, another foggy day with a little more roll, began with a few dredges, then it was time to steam to the grab sample site. Once there, we lowered the keel and turned on the ADCP to monitor currents at the stations. KG, Jonathan, and I worked to get the metal grab sampler in the water and winch it down. Due to the roll of the boat and a wire that was not marked with any sort of depths, it was hard to tell when we had hit bottom. After many hours, we only had one sample, and had to move on to another multibeam survey and more dredging. Luckily, during the second survey, the multibeam worked great under my control and science was very happy. Another problem soon struck, when the winch computer was no longer reading tension as we were launching a dredge, and later the CTD winch left the device hanging halfway down to the bottom for nearly an hour. KG and I went down to the engine room to reset the computer, but it wasn’t quite done causing problems.

Today the habcam was back in the water, and it was a nice, sunny, calm day. We were doing habcam tows off Cape Cod and working our way back south to Nantucket. I was monitoring the multibeam with no major issues, until there was commotion in the lab due to a winch tension spike, everyone thinking we had struck bottom hard with the habcam. To pass the time, KG had me work on a spreadsheet that gave information about max depths of various sensors. However, we pulled it up to reveal no damage, and it was likely another fault in the winch computer. We recalibrated the computer and dropped the habcam back in, but KG stressed to Sean and the engineers that this is an issue that needs to be looked out by a professional at electrical equipment. Later, KG gave me a brief introduction to the different types of serial and VGA connections and how computers “talk” to each other. By Sunday afternoon we will be tied up in Wood’s Hole, MA where I will post more pictures. Until then!

 

Huxley

 

Deep Water Horizon, Shipwrecks and ROVS

After completing our event in Baton Rouge we made our way to Morgan City, where we met several workers at the Oceaneering facility. For many years, Oceaneering has centered its ROV work in the Gulf of Mexico, laying pipelines for oil rigs. However, due to a dying industry, they have shifted their energy towards research endeavors. We will be working alongside oceaneering workers, scientists and LUMCON’s director- no pressure! The Mississippi Canyon is a region located wtihn the Gulf of Mexico-where the Deep Water Horizon tragedy occurred only several years ago. The mission of our ROV cruise is focused on deep-sea biodiversity. We will explore many sites, including the Deep Water Horizon region and several other shipwrecks. In addition to ROV footage and collection, our scientists onboard will be conducting several “woodfall” stations using a basket rigged to our side winch (see top description).

Our first day in transit set the tone for the rest of our cruise- full of problems and excitement! We spent a majority of the first day refueling and rewatering, while also fixing and ordering a port navigation light that went out during the night. During our cruise, we deployed both the ROV and a steel basket filled with logs off our side winch. However, the memo that we would be using a basket did not make it up the chain of command, and many crew members found themselves dumbfounded and flustered by the event. Because Oceaneering made our floating tether for our basket too long, we spent a majority of our trip retooling a method for disconnecting and reconnecting the basket at the bottom. The idea is to deploy the basket and ROV to the bottom with transducers on the basket, ROV and site mooring. The mooring will be dropped at our log location and the ROV then must open the basket with a robotic arm and insert logs into the sediment for later recovery. The mooring will stay down below for later return.

In short, the basket caused much more trouble before it became better. Deploying both a basket and ROV off our boat- which is not a DP vessel- is very dangerous as wires can become tangled in our wheels. Because of this, the Captain held position manually our whole trip. After a few days of refitting, and very very long nights, we found several issues wrong with our side winch. Our side winch has not been used this deep (2000m+) in a very long time. While deploying our basket, our chief engineer found several kinks at 1800m of line. We had to immediately pull and address the winch issue, which could not be fixed. Luckily, we reterminated our basket wire and fitted it to our other side winch- which worked swimmingly! Posted below is a photo of the infamous basket! Which I may add a small ancetdote- we found a lizard in there! The lizard must have came from LUMCON and got stuck in a log pile. She (which we originally thought was a he, before she laid an egg) swam all the way back to the boat when the basket was deployed. I took care of “Wilma” for several days and she made it back to LUMCON safely! I will post a photo in my later blog, when the cruise ends!

 

PC: Jason Bradley- an extremely talented photographer who accompanied us during our cruise! He has many more pictures coming- so stay tuned for more 🙂

In addtion to our basket and winch, I learned so much during this fun- yet extremely stressful cruise! For starters, I learned about transponders- an acoustic location system which uses pings and beeps to locate objects for later deployment. As stated, we used these devices on our ROV, basket and moorings and tracked them on a program called Tracklink 5000. It is very important to know where our equipment is while on the vessel- to ascertain nothing is under the boat or tangled (which almost happened a few times). Perhaps my favorite part of the cruise was all the amazing ROV technology! It is incredible that we can set an instrument under water and see what is happening in real time- and do scientific sampling and work! I learned how to tagline, deploy, recover and “fly” an ROV. All very dangerous- yet exciting. Posted below is a photo of my flying for the first time! The cruise is not yet over, but I am so extremely grateful for this experience, the science party and the crew I’ve grown to love with all my heart.

 

PC: James Aldridg from Oceaneering

 

And the rest! (more to come) All from Jason Bradley!

A deep sea isopod we collected!

Dreaming of beer and hamburgers.

 

STAY TUNED!

Its week two on board the Atlantis

It’s Week Two. Yes the second week has ended and this one snuck up on me.  We keep to a steady schedule of getting out of bed at five, prepping the sub and trying to get it out on deck around seven fifteen, and in the water by eight. This means we all need to on our game to get our task done the right way wile being the most efficient. Sadly this means finding time for pictures of the prep, rollout, and launch can get difficult. Now have no fear I have some pictures of all the other work I’ve been doing.

 

            Now I believe I left off on last Tuesday with describing my struggles of finally getting the network figured out. So were on to Wednesday.  Wednesday was s bit of a late start for various reasons we did not get into the water till eleven o’clock. The camera crew that I had briefly mention before had bee for a show on Vice. Now I never caught what the show was called and any other information for that matter. It was very strait forward, here is the sub, here is how it works, and then they got to go down for a ride and look around. Do to the work I was doing at the time I didn’t really see them too much.  The Vice crew had there own vessel that they would return to at the end of the day and by Thursday they were gone.  

 

            Thursday, well Thursday is the day when the weather changed from sunshine and smooth waters to rain, rain, and more rain.  It really wasn’t that bad because the storms didn’t last long enough to produce large waves.  I started a new side project were I had to rebilled the thermal couples on the sub’s ICLs (inductively coupled link).  An ICL interface allows for a non-contact serial communication with an instrument via a pulsed AC magnetic filed.  This allows the sub to use different interchangeable tools on one arm and not have to worry about wires. 

 

            Friday was a little more interesting. The sub went into the water at its normal time and I continued work on the thermal couples. In all it went according to plain until it was time to pule the sub out of the water.  We had a visitor land on the walkway we use to get people in and out of the sub wile it was on deck.  At the time we didn’t think anything of it, birds land on the ship all the time so it was nothing new.  So after a wile we are finally bringing the sub in and this bird had not left yet.  Well we tried everything short of pushing the bird off the walkway and it still wouldn’t leave. Lone behold it wasn’t until we got everyone out of the sub when this bird decided stop standing in the middle of the walkway and flew off.

 

            Saturday was a great contrast to Friday because it didn’t stop raining.  It was raining when we put the sub in and was raining wile we took it out. There were no problems with the sub and spent most of my work time that day soaked to the bone.  The one thing that was interesting was the thunderstorms that night. Lightning rarely touches down out at sea so most of what we were seeing would branch across from one end of the sky to the other.

 

            Lastly it is today, Sunday.  The day started off like all the others, wakening up at five and getting the sub into the water. The weather finally started to clear up and the day was going well. Then around One

O-clock a pod of dolphins came by the ship. There had to be at least one hundred of them.  They were chasing down a school of fish and just so happened to pass by the ship. It had happen so fast that it was over before most of the crew new what was happening.  When it came time to bring the sub up it had begun to rain again and once it was on deck we got it into the hanger as quick as possible and unloaded the passengers from there.  In all the day went really well, other then getting bogged down with work for the sub tonight I have been in a pretty regular schedule the last two weeks.

 

            I am going to try to leave more photos this time and I noticed that my last photo didn’t scale properly for my posting.  I don’t know it if the case for everyone but if it continues to happen you can view the photo by right clicking and going to view image.  I am trying to figure it out.

Week 2 on R/V Sharp

Hello again from the R/V Sharp! It has been quite a crazy week on board. Last Saturday was quite rough, and many of the scientists were out of commision with sea sickness as the habcam was towed once more. Showering was quite an ordeal! I had to take a pill when I felt it coming on…but luckily soon afterwards I was fine. I learned how to terminate, or put the end plugs on, ethernet cables that we might need when we figure out what is wrong with that internet. After a little trial and error, we got our terminations to work! Dinner was amazing, where Paul, the cook, prepared seafood alfredo featuring the some of the scallops we caught yesterday. Sunday was another gorgeous day weatherwise with the seas lessening, as we reached the northern Jersey shore with the cam. The water began to change color from slightly translucent blue to the more opaque sea green I am used to. The scientists showed me a habcam image of a dolphin, which they happened to get a very clear shot of.

Monday was calm but rainy, so we spent the day inside fixing code for the winch plot graphs, which were not reading tension porperly. These are important because we need to know how much strain the habcam is putting on our deck winch. It took a while, as Christian and I are both relatively new at coding, but we talked out and worked thorugh the problem together until the front office was happy. Tuesday we got a task via e mail from KG, the senior tech who was not on board, to design a flowchart for the internet system so we can more quickly find the problem when we get back to port. It was a long day of tracing wires throughout the entire ship, and even then we did not have a complete chart! As we were working on the bridge, we got a chance to talk to Jimmy, the captain, who was very nice.  He told me to stop by his office some time so he could give me a crew shirt, affirming that I was a true crew member.

Wednesday we went back to port in Lewes, Delaware a little early to avoid an oncoming storm. The cruise was a success, with scientists processing over 3 million images that will be used to estimate scallop populations. I helped tie up the boat, then worked with Christian to turn off the flow through system. KG and Tim Deering came on board and we all worked on the internet, adding to the flowchart. When we all ran out of ideas, it was time to call the IT company on shore that we work with. I had the rest of the day off, and felt quite landsick once I left the boat as I was not used to standing on solid ground. Yes that is a thing! Christian invited me over to his place for dinner, where we talked about his previous experices as a science volunteer on other research ships and what working on the Sharp was actually like.

Thursday it was raining once again, as all hands were on board to get set for the second leg. I helped the crew load a sediment grabber, and worked with Drew to drill into metal plates that will be used to better anchor the CTD. KG, who will be working with me on the next leg, showed me a little about how the multibeam scanner worked. We will need it to get an accurate profile of the bottom on portions of this leg. Pam, the cook for this leg, arrived, causing me to have to vacate the room I had been sharing with Paul and move down with a scientist. I spent the last few hours working with Pam and Joe, one of the shoreside workers, to load food and distribute clean linens.

Finally, Fiday morning we casted off again to begin the second leg, heading north along the shelf towards Massachusetts. Once I helped with lines again, I worked with KG and Drew to start the flowthough system, lower the keel and start the various systems for data logging like the SMS. 
After a while of steaming, during which time I worked on a spreadsheet describing all the sensors we own, taking pictures of them, and linking them all to their digital manuals. The CTD is much more complex than I thought! In the evening we deployed the habcam again, and after that time it was my day on the rotation to clean the boat and empty trash. I then was told to see Sean, the Chief Mate, who told me I have to move rooms again tonight because all of science wants to be dowwnstairs together. Since our job is to keep them happy, I told him that I would move to a pullout sofa in the conference room. I felt that I had to be willing to be flexible. At least now I have control of the ice cream freezer! I am looking forward to this next week, an learning much from KG who is an incredibly knowledgeable marine technician.

 

Until then,

Huxley

Pictures from Scallop Leg 1

/files/marine/files/IMG_0720.JPG/> : Arriving at the Sharp

/files/marine/files/IMG_0728.JPG : The habcam pre deployment

/files/marine/files/IMG_0726.JPG : The scallop dredge pre deployment

/files/marine/files/IMG_0731.JPG : Leaving Lewes, DE

/files/marine/files/IMG_0735.JPG : First sunset at sea

/files/marine/files/IMG_0736.jpg : Deploying the habcam

/files/marine/files/IMG_0742.jpg : Friends I saw off the bow

/files/marine/files/IMG_0753.JPG : The scallops we caught while dredging

/files/marine/files/IMG_0754.JPG : I got a chance to shuck a bunch of scallops with the scientists

/files/marine/files/IMG_0760.JPG : The bottom that we dredged up

Page 61 of 89

Powered by WordPress & Theme by Anders Norén