So much of this week has me running around doing a million things. This week started off with building storage shelves. The task sounded easy enough at first, but then all of the metal bars were bent, the wood didn’t fit in place, there weren’t enough brackets so we had to make more. By the time we finally finished it was the end of the day. The rest of the week has consisted of pulling items off the sub and unraveling the wires. The wires were so much effort to try and pull them through tiny spaces. And of course right where you can just barely get to it is a zip tie you need to cut. One of the biggest things I did this week was helping with the penetrator removal. The penetrators allow for wires to pass from outside the sphere to the inside while maintaining a seal. They are very important and need to be handled carefully. After they are pulled out, I would take them, fill out a certified tag identifying the object and it’s serial number, after inspection they would be packed up. This week has been busy but I’m glad to be back at work.