It’s been a rainy week. There was flooding happening in downtown Miami. We decided to finish some indoor carpentry projects to stay out of the weather. We made some shelves, doors and a cover of an air conditioner unit. We also decided to test the emergency shower in the wet lab, but when we turned it on we could not turn it back off. We then needed to go to the maine water shut off valve for the shower but that was also not working so we had to shut down the ship’s entire fresh water system. We spent the day fixing the plumbing for the shower and fixed both valves. Now it’s working better than ever.