Category: MATE Blog Archive Page 28 of 89

Posts that were imported from the historical MATE blog at marinetech.org

Week 2: Time in Port and Beginning of OOI Pioneer 18

Hi everyone!

This past week has been great! Picking up where I left off- on Sunday (4/3) we returned to port. The science party departed and by Monday all of their gear was offloaded from the ship. Sunday evening, I hung out and relaxed with my mentors and the crew, as we were all tired from the rough cruise we had just completed. Due to the poor conditions, the chief scientist decided to end the cruise early, so getting back to port on Sunday was two days earlier than the schedule. On Monday, I got some extra rest and did a couple small projects. In the morning, I installed and wired a small video camera in the main lab to help the SSSGs relay information to the scientists on the cruise website. In the afternoon, I cleaned the pCO2 filter and replaced bottles on the CTD rosette. Six of the 24 Niskin bottles had been temporary removed for the previous cruise so that ADCP instruments a scientist personally brought on board could be accommodated inside the CTD frame. Once those extra instruments we removed, there was room to replace the Niskin bottles. It was beautiful weather on Monday, so I took full advantage. Once everyone was done working for the day, I went out for a walk around Woods Hole. It was amazing to finally get the lay of the land that I had heard so much about. I first set out to a nearby beach. On my way I saw other scientific buildings including the NOAA Fisheries building and the Marine Biological Lab that is affiliated with the University of Chicago. Then I made a big loop through the neighborhood and came out on the other side where people first arrive at the waterfront. I saw more WHOI buildings and activity as I returned to the ship. It felt wonderful to get fresh air and some steps in. It was also awesome to finally spend time in town since we went out to sea for the first cruise quickly after my arrival in Woods Hole. The town of Woods Hole is incredibly charming, and I feel very lucky to be participating on cruises that start and finish at the WHOI dock. I am also very glad to have experienced the area in such nice weather- I hope to come back and visit with my family someday soon!

Walking around Woods Hole on a beautiful day

 

On Tuesday, Croy got me started on a project related to the day before. Now that the CTD was full of bottles, I was to replace the pieces of the fishing wire lanyards that help hold the bottles open before they are triggered to close. Although I had made new long pieces during the previous cruise, the top and bottom caps have separate lanyard pieces that required four crimps. Although the project was straightforward and enjoyable, it was time-consuming. I made sure each piece was the correct length so that the bottles have the right tension when cocked open. I worked throughout the day on this project and then enjoyed having dinner with Emily, Croy, and several members of the crew. It has been a lot of fun getting to know members of the crew and talking to them about their at-sea experiences and travel.

Measuring, cutting, and crimping fishing line to create the new CTD lanyards

 

On Wednesday, I worked in the CTD hanger again, finishing the installation of the lanyards on the CTD. This allowed me to view the preparations for the upcoming cruise. Large OOI buoys and gliders started being loaded on to the Armstrong. I had seen lots of pictures of the OOI buoys before, so it was a neat experience to see them get loaded on to the back deck of the ship. They are huge in person and have a variety of atmospheric and surface ocean instruments as well as solar panels to provide energy throughout the mooring they are attached to. In the afternoon one of the science party members, Dave, helped me cock all the bottles and adjust them to an optimum tension when they are open. Dave has years of experience working with CTDs so it was great to learn the best way to properly work with the bottles (it’s very important to make sure the caps are never slammed closed while the bottles are empty because it can crack them) and organize them on the rosette so that they are spaced efficiently. As work started slowing down in the late afternoon, I met up with a family friend, Pat, that lives near Woods Hole. It was wonderful to meet her and learn more about the area from a local’s perspective. She has known my mom and grandma for over 50 years, so I appreciated connecting with someone with close ties to my family. My mentors encouraged me to give a ship tour, so with the captain’s approval, I gave Pat a tour and it was a lot of fun. It was a perfect way to relax and reset before the upcoming cruise.

First time fully cocking the entire rosette of Niskin bottles after attaching new lanyards

On Thursday, I worked on another computer project. Once again, I reconfigured an old computer that wasn’t being used. I changed the computer from running Windows to Linux. Then, I added a program called OpenCPN. This open-source program is a mapping/charting program that can be used to track the ship and draw in waypoints on a map view. The computer is now hooked up to the network so Emily and Croy can view it from their computers in the tech shop. They had access to the program before, but it was not very efficient, so now it will run more smoothly. I rested up the rest of the evening and got prepared for an early departure time the next morning.

On Friday (4/8) at 9:00 AM, we got underway. There was thick fog as we pulled out of Woods Hole. But once we passed Martha’s Vineyard, it burned off. Passing Martha’s Vineyard also meant that the waves were inevitably larger. It was still a bumpy ride as the ship went back and forth and side-to-side a good bit. But, thankfully, it was a lot less choppy than last cruise. The sunny weather conditions made it pleasant to get fresh air out on the decks. Lots of fresh air and the timely administering of sea sickness meds (based on what I learned last trip) helped me make it through the entire day without any severe seasickness symptoms. The schedule also played to my advantage. During the day we transited to our first station which will be our farthest station from shore. During the transit, I was able to rest, get acclimated, and regain my sea legs before starting work. Once we reached the station at about 8:00 PM, operations began. First, I watched gliders deployments over the side by the OOI team. After 3 gliders we deployed, I helped Croy with a CTD cast. It was my first official non-troubleshooting CTD cast. The CTD worked properly and I learned the protocols for each CTD cast. After the CTD cast pwas complete, I filled up five 5-gallon plastic carboys with seawater from the underway system in the ship’s main lab. The task was assigned to me because the scientist from MIT in need of the samples was not onboard for this cruise. It was a cool experience to directly help a scientist obtain research samples.

 Late night CTD cast on Friday

Early Saturday morning, deck operations continued. I helped Emily prepare USBL tracking beacons. The beacons will be used on Tuesday when the Seaeye ROV Falcon will be operated. We made sure the beacons were fully charged and noted their identifying number so we will know which one is which when they are used with the ROV. The science party deployed one of the large OOI buoys along with attached line and a package of instruments used as an anchor to create a mooring in conjunction with the floating buoy at the surface. After that, I helped Emily upload the feed from the camera I installed last Monday onto the website so science party members can access the information anytime during the cruise. In the evening, another glider was deployed followed by a CTD cast at 6:00PM. After three CTD casts, I have started to internalize the process. In the coming days, I will have the opportunity to lead the CTD deployments which I am excited (and a bit nervous) about. Science operations resumed early yesterday morning as one more of the remaining buoys/moorings were deployed as well as two gliders. We have one more buoy to deploy before others are recovered. The amount of equipment being deployed and recovered on this cruise exceeds the amount of space the ship offers so the cruise will be broken into two legs with a day in port in between. I am looking forward to the rest of this first leg and I am excited to keep learning and sharing more of my experiences in the days to come.

Until then!

Thanks for reading,

Tyler

 Helping Dave (WHOI) cock the tops and bottoms of the Niskin bottles for the proceeding CTD cast (photo credit Croy)

Week 1: First Cruise

Hi everyone, 

Here are details from the first week of my internship! When I arrived in Woods Hole the shuttle from the airport dropped me off right at the Smith Building close to the WHOI dock. My SSSG (marine technician) mentors, Emily and Croy, were there to greet me. We quickly walked through the ship operations yard and as we rounded the corner, there was the R/V Armstrong in all its glory. I was over the moon to see the ship in person for the first time! The sharp white letters Neil Armstrong on the majestic blue of the vessel’s hull made me feel like this was all a dream. On the other hand, Emily and Croy, who are both experienced technicians on the Armstrong, nonchalantly led me onto the ship and showed me where my stateroom was located. I excitedly carried my stuff onto the ship even though I was very tired from traveling most of the day from the west coast to the east coast. As I began unpacking my bag, I took a breather – overwhelmed by the realization that I was here in Woods Hole and on board the R/V Armstrong! Emily gave me a quick tour before introducing me to the captain and some of the crew who were hanging out in the wet lab. Emily, Croy, and I got dinner together and walked through Water Street right next to the WHOI dock. Even though many of the businesses were closed due to it still being the offseason, the walk gave me a feel for the Cape Cod charm I have heard so much about. Between all the WHOI activity and the picturesque location, it was instantly clear to me why this is the spot to be for anyone who is interested in caring for and studying the ocean. 

The next morning, Emily gave me a more thorough tour of the Armstrong. This ship is amazing! Everything is well taken care of and organized. The ship makes effective use of every space. I was even more impressed than when I first arrived at the outside of the ship. Soon after my tour, Croy put me to work on my first project as an intern- pCO2 plumbing. The pCO2 instrument which is mounted to the wall in the wet lab had a drain that was composed of mostly tubing which Croy thought looked disorganized. Furthermore, the tubing was not up to code. While the drain was not a super crucial part of the setup, as it simply drained the sea water that was filtered through the instrument, it was important that the drain be remade out of more permanent PVC. The change from tubing to PVC would ensure that it will pass inspections when the Navy and NSF visit the Armstrong. After spending most of the day cutting and fitting PVC pipes, it was configured the best way possible. It had to be tucked back so that it did not interfere with the opening of the nearby fire extinguisher holder. By the end of the day, the pipe was dry fit and ready to be glued which I completed the next morning. 

Working on the pCO2 drain plumbing project (photo credit Croy)

On Friday at 15:00, we got underway from the WHOI dock. It was sunny and warm, with very calm waters. Unfortunately, that was about to change… and in a hurry. As soon as we passed by Martha’s Vineyard, it got extremely choppy as the Armstrong was going head on into the waves. Things went from manageable to unmanageable for me very quickly. I was out getting fresh air when I could feel it getting worse. I tried to make it up to my room as fast as I could. I succeeded and climbed up to my bed to lay down. It felt like things only got worse for me as evening turned into night. I had to face it- much to my disappointment, I was seasick. Luckily, my bunk mate, Chris, was very understanding and brought me crackers and water. I am very grateful for his kindness. I made it through the night, but barely got out of bed until the next evening. The bed was my savior through the challenging times. The boat changed to moving side to side instead of back and forth. At around 17:00 the next day (Saturday), I went down to check in with Croy and get more crackers. My sea legs had not been found, and I had to really concentrate to grab my crackers and leave the galley without running into anyone. Luckily, I heard some good news- at least related to my seasickness. There was a large storm coming so the crew decided to retreat back to behind Martha’s Vineyard to hide from the storm. This was unfortunate for the science of the cruise, but I welcomed some time to recuperate from my bout with seasickness. Soon after hearing the good news and grabbing more crackers, I hit the sack and went back to my safety blanket- my bed. Luckily when I got up, things were much better. I practiced walking in my room a bit to try and gain some balance. By the time I went down to the deck things were calm and I felt better. By Sunday afternoon, the ship had parked near Martha’s Vineyard which shielded us from the large waves we encountered the night prior. I was able to observe and lend a helping hand to Emily and Croy while they did some maintenance on the CTD (Conductivity, Temperature, and Depth instrument). The CTD was having trouble taking data below 1000 m. Croy surmised it was a short occurring in the CTD cable. Amazingly, the steel cable that holds the entire CTD rosette also encases electrical wires that power the CTD instruments and transmits the data. Croy used a megger to test the insulation resistance on the working end of the wire that attached to the CTD and got a lower than normal reading. Then the part of the wire at the other end attached to the winch was meggered and much higher, more normal readings were recorded. We ended up cutting pieces of the working end bit by bit until better readings were taken. By the end, approximately 30 m of wire was cut from the working end. 

Helping with the megger testing of the CTD cable (photo credit Croy)

The next morning, we had to take sensors off the CTD because it was below freezing at around 28 degrees F. Some of the fragile sensors could be damaged if the moisture inside them froze so Croy and Emily wisely brought them inside to keep warm. Next, on my personal intern project list, was taking pictures of the scientist party for the custom website Croy and Emily update for each cruise. One of the science party members for the cruise was Nikiforos, an engineering assistant at WHOI who I had met the day before while eating in the galley. He had not realized I was a MATE intern until that moment when I was taking the pictures. Nikiforos shared with me that he had also been a MATE intern and had a great experience. It was neat knowing that three former MATE interns (Emily, Croy, and Nikiforos) were on board with me! 

Once I had taken pictures of the science party, Emily showed me how the website works and helped me with the Linux code used to upload the pictures so that they could be displayed in the proper location on the website. Later that afternoon, I practiced soldering with some of the wire that had been removed from the CTD cable the day before. I plan to practice more soldering in the days to come. Emily said that later I could learn how to solder with fiber optic cables. 

Adjusting Sensors on the CTD (photo credit Croy)

Tuesday morning at 6:00 AM, we resumed our transit southeast to the New England Seamounts. The crew and science party were hoping there would be a break in the weather to deploy at least one of the several moorings they were planning on setting up. We arrived late in the evening to the first waypoints. In the meantime, Emily and I took one of the unused computers from the computer lab so that I could work on redoing the hard drive. In the middle of the day, Croy had me cut and crimp the plastic lanyards for the Niskin bottles that are used on the CTD to keep the bottles open until they are triggered to close. Then we replaced the old lanyards on the bottles with the new ones. It was a bit tricky, but I slowly got the hang of it. In the afternoon, I went back to working on the computer project. With Emily’s help, I successfully changed the computer from running Windows to running Linux. Then I helped reprogram it so that it can be a backup for Tentacles- a computer that is able to display a live feed of data from all the instruments onboard. In a few hours, we reached the first waypoint for science at the New England Seamount Chain. The seamounts are in the Gulf Stream pathway which was seen in the ship’s underway data- with the following seas we had, the ship was traveling at almost 15 knots which is about 5 knots faster than the usual cruising speed! Once we reached the seamounts, mooring operations began. Although my mentors and I were not involved with the mooring deployments, it was interesting to watch them on deck. Unfortunately, the mooring deployments were not entirely successful, and the operation will require a future cruise to complete. After a brief window of good weather for science at the seamounts, we transited back to Woods Hole to try and avoid the next storm. There were very rough seas on the way back which meant I hunkered down in my room. The transit took about three days because of head on waves and thankfully we arrived safe at the WHOI dock this afternoon. There will be a few days in port before going back out for the OOI maintenance cruise- I am hoping it will be filled with more science and less seasickness! Thanks for reading and for your support. 

More details and updates to come soon! 

Tyler 

Late night CTD troubleshooting (photo credit Croy)

Pre-internship: Introduction

Hi everyone! 

My name is Tyler Peterson and I recently graduated with a Bachelor of Science degree in Oceanography from the University of Washington in Seattle. My internship will be hosted by the Woods Hole Oceanographic Institution (WHOI) on board the R/V Neil Armstrong. I am very excited to be joining the ship for two research cruises in the North Atlantic from March 23rd to April 30th. The first cruise is an ocean acoustics field experiment at the Atlantis II Seamounts. The second is the spring infrastructure deployment and servicing cruise for the Ocean Observatories Initiative Pioneer Array located on the continental shelf and slope south of New England. 

Shortly before joining the University of Washington School of Oceanography, I had the opportunity to participate in a short research cruise in Puget Sound. I loved being out on the water and helping with marine data collection. It confirmed to me my interest in oceanography, and I immediately knew I wanted to participate in more research cruises. During my Ocean Technology class, I learned about the role of a marine technician which inspired me to pursue this internship. I am very eager to meet and learn from marine technicians Emily and Croy on board the Armstrong. I am extremely grateful that this opportunity will allow me to realize my dream of going out on research cruises to help with marine data collection, while also providing me the ability to develop skills and knowledge that will help jump-start my career in the field of marine technology. 

I am also excited to be traveling to Woods Hole, Massachusetts, for the first time. For 11 years, my mom grew up and attended grade school in the North Falmouth area which is about 20 minutes from WHOI. Ever since I was little, my grandma has shared with me stories about Woods Hole and “the Cape” (Cape Cod). “Woods Hole is such a neat place, Ty! You would love it!” my grandma has told me many times. She has always encouraged my love for the oceans and been an inspiration for me to study oceanography. I know she will be excitedly cheering me on from the Sacramento area in California, where I grew up. Thanks “Nan”!

Before my internship begins, I want to thank Maria Osiadacz of the MATE Center and Sarah Fuller of WHOI for making this opportunity possible. I also want to thank all my family, friends, and teachers who have supported me and helped me grow- I can’t wait to share this adventure with you!

I will be leaving Seattle early on March 23rd (tomorrow!) and arriving in Woods Hole to board the Armstrong in the evening. I am looking forward to writing my next blog post from on board! Until then… 

Thanks for reading, 

Tyler 

 

My first research cruise aboard the R/V Rachel Carson

Week 7: The End

Well, my adventures aboard the Sikuliaq have finally come to an end. The story of our shakedown cruise and my last week on board was extremely eventful, to say the least. I’ll start back in Portland, before we set sail for Newport. We took on a bunch of science crew from OSU, Woods Hole, and the USCGC Healy, who were observing our science ops and sensor calibrations. We were all ready to set sail Wednesday morning; full fuel tanks, stores loaded, seasickness pills take…and then the car didn’t start. For some reason, on of our thrusters decided that it didn’t want to turn on, so we were stuck on the pier for the time being. The engineers worked all day and all night to find the problem and get us moving, but the problem was a little more devious than anybody thought, and eventually they had to admit defeat and call in the big guns. The company who manufactured the motors, Siemens, sent out a tech to help us get up and running again. We were all excited to finally get moving again, until we heard that the tech had lost all of his tools and test equipment at the airport. Seriously, Murphy’s law was having a field day with us. Despite all the setbacks we had experienced, the tech finally made it, and he and the engineers worked their butts off to get our motors functional again. 

While the crew were working to get us underway, the science party was busy getting familiar with the ship and all of the cool toys we have to offer. The other marine techs and I spent hours each day showing them all the different sensors and machinery that Sikuliaq uses to support research. It went much faster at the pier than it would have at sea, so by the time we were ready to set sail again, everyone was ready to jump right into the fun stuff. 

We set sail on the afternoon of Saturday the 19th, and we jumped right into the sensor calibrations. The ship anchored next to the shipyard, and at 5 pm, we started the calibration for our EK 80 Echosounder. Described by the techs as a “super powerful fish finder”, the ship uses it to locate biomass under the ship. It has a very narrow beam, so to calibrate it, we suspended a small metal ball under the ship using three fishing reels, and moved it until it was directly under the sensor array. Once it was in place, we had to move the ball around so it could get pinged across the sensor’s entire beam. We had to move it by reeling the three fishing reels in or out, and we could only see the ball on the sensor itself, so it was tricky trying to get it to go where we wanted to. The entire sensor is actually an array of smaller sensors, which meant that there were several different frequencies that needed to be done individually. From getting the ball in place to getting enough pings on the calibration ball, it took on average around 2 hours to finish one of these. In addition, on our last calibration, the lines kept getting tangled on debris on the bottom of the river, so it took even loger to get the ball in place. By the time we finished, it was 8 am, and none of us had slept. Despite this, we had finished the calibration, and luckily we had the entire trip upriver to catch up on sleep. 

Once we reached the ocean, we sailed out to several deep sites to run our multibeam sonar and to calibrate and commision the new 38 kHz ADCP that we had installed. This was a little less involved than the EK 80, so we just had to monitor the data coming into the computer lab while the ship did laps across the sensor sites. Also, you’ll remember that we had to rebuilt the CTD a few weeks ago. This means we also had to do a couple CTD casts to make sure everything was up to spec.

Here’s a picture of our second CTD cast. You can see the light from one of the fluorometers attached to the sensor array on the bottom. 

Ironically, even though we left port days behind schedule, we managed to get all of our work done and finish the cruise exactly on time. The fact that we were able to get everyone up to speed about the different equipment on board while we were stuck in Portland probably helped us get everything done much faster than we otherwise would have. However, our speed is mostly due to the fact that everyone worked incredibly hard to get everything done. I haven’t seen so much disregard for a proper sleep schedule since midterms last fall, and seeing the commitment everyone had for the work was truly inspiring. 

My time on Sikuliaq was really something special. I learned so much about so many different things that my brain hurts just a little with everything stuffed into it. Everyone I worked with was incredibly smart and each one of them taught me something new every day I was there. I’d like to give a shoutout to Ethan, Carmen, Bern, and Dan for dealing with all my questions and helping me be the best I could be during my time onboard. I’m really going to miss working with you guys. Now it’s time for me to get back into school mode and get back to normal, so I’ll say goodbye. If any of you reading are interested in anything I’ve talked about, I would encourage you to apply for a MATE internship and try it out. It’s definitely a unique experience, but it’s one of the most fun things I’ve ever done.

Working on the RV Sikuliaq – some pics

Week 6: Setting Sail

Well, we’re finally here. After a month in the shipyard getting disassembled and reassembled almost daily, the ship is ready to get back out to sea. The whole crew has been working hard to get everything cleaned up and ready to go for this shakedown cruise. The deck department repainted the deck this week, the engineers refueled the ship yesterday, and the marine techs got all of our onboard sensors up and running again. All the different observers and technicians coming on the cruise came onboard today, so we’re finally ready to leave port. That should happen tommorow morning, after a few last minute things that still need to happen.

I’ve spent the last week with the marine techs finishing up preparations for the cruise. We’re going to be using this trip to recalibrate all of our sensors, as well as test and commission the new ones we put in this winter. It will take us about 8 days to sail from Portland to Newport. We have to sail offshore about 200 miles to several deep spots to get the depth needed to calibrate our sensors. After we’ve made sure that everything is up to snuff, the ship will dock in Newport and start going on science cruises for the year.

Since we were able to finish up all of our shipyard projects really fast this year, I spent a lot of ime this week working on a project that I got before coming onboard. As I said in my first blog, I study naval architecture and marine engineering, so during my time here, I’ve spent a lot of time studying all the different machinery systems and the design of the vessel. I’ve had to draw a lot of different schematics and plans for the ship, and it’s helped me learn about the ship so much faster than I otherwise would have. Even though Sikiuliaq is a relatively small ship, it’s built to handle a really harsh life, so every system onboard is much more complicated than I thought it would be. Even though having to trace all the different systems and hunt down all the information I could about the ship was really difficult, having an insight into how everything runs and fits together was really cool as I went about my duties every day. 

To end on another happy note, another effect of finishing all our work early was that my mom got to come up to Portland on monday. I got to show her all around the ship and everything I’ve been working on, which was cool, especially since she’s never been on board before. I’m glad I was able to hang around the city with her for a while before we set out to sea. Here’s a picture of mom being really excited to come onboard.

I will post my last blog after we get in to port next week. I’ve heard that the weather will make this trip almost as memorable as our last one.. See you all then.

Week 5: Finally Floating

Breaths were held, bets were placed, and prayers were uttered last Friday as we got ready to float free. In all honesty, maybe it wasn’t as dramatic a moment as it felt like, but it was still pretty important. We had been working on the ship for a couple weeks, and it seemed like we had opened up every possible place water could leak in. Not to say that a loose bolt would have sunk the ship (Knock on wood; stranger things have happened), but it still would have been a massive pain to lift the ship back up and fix anything that went wrong. Luckily for us, the worst part about the undocking was that it started at 4:30 in the morning. Because we started early, the undocking finished pretty early, and I spent the rest of the day working on 3D printing a new soldering tray for the tech department. 

Since we went back in the water, everyone has been getting the ship ready to go back to sea. One of our biggest concerns has been getting the CTD back up and running. Carmen, one of the other techs, and I spent an entire day rebuilding the CTD sensor array. It was really interesting to see how every sensor is connected to each other and how it’s able to collect so much data. It took the two of us another whole day to get the CTD cable ready to use. Remember how we had to take the cable off the drum to lube it? To do that, we had to cut the end off, which meant losing the connection to the CTD. Luckily, the cable terminations need to be redone every few months anyway, so this gave us a good opportunity. The cable actually needed two separate terminations: one mechanical, to support the CTD and deploy it, and one electrical, to relay telemetry from the sensors to the computer lab. The electrical termination was a relatively simple matter of soldering the wires in the cable to a connector. The mechanical connection was more tricky. It works by securing a bullet-shaped piece of metal to the wire with several steel coils wrapped around it. A housing is then attached over this piece, which prevents it from moving along the cable, allowing it to hold weight without slipping. Needless to say, nothing is simpler than on paper, so actually attaching the termination was rather difficult. The metal coils didn’t want to cooperate, and it took some artful maneuvering with a lever to get them in place. Beyond that, the threads in part of the housing had become damaged, and it wasnt until we had taken the whole thing apart that we figured it out. It was frustrating, but we got it, and we all learned a lot more about terminating a cable.

The CTD was the big job this week, and it still needs to get wrapped up. Other than that, this week has been light. I designed some parts for the centerboard and cleaned out the science fridge spaces, but our shipyard work is wrapping up. We set sail in exactly one week, so I’ll check in before that.

Week 4: Drydock part two: Electric Boogaloo

As I recall, I promised an update on the ADCP install in my last blog post, so I’ll start off with that. To save you all from 30 seconds of laborious clicking to remind youself what our problems were, I’ll throw in a quick recap from last week. We put the new sonar in, which went swimmingly, but when we connected the cable that would connect the sensor to our computer lab, the connecter was barely too big to fit in the housing. Luckily, barely too big is better than regular too big, and it let us resort to the tried and true cheat solution of stuffing it in and hoping it doesn’t break. Despite our worries, it did fit, although the cable got bent a little more than we would have liked. It seems to work, but we’ll see when we float the ship and finally turn it on.

Anyway, finishing the ADCP project means that we completed all of our big projects for shipyards, so we’ve shifted to tackling all of the small things that got shoved aside when we drydocked. When we first got to the yard, I uninstalled a small sonar sensor from the centerboard. For some reason, using the sensor was causing the metal rods holding it in place to corrode instead of the sacrificial anode. We figured that 3D printing new rods would stop this from occuring. At first, it seemed like a genius idea, but designing and printing these rods was deceptively difficult. Each rod needed to have threaded holes on both end, but taking the support material out of the piece usually caused us to ruin the threads instead. It took us a while to figure out, but eventually the solution we used was to insert metal springs, which act as threads, into the holes. Usually these springs are used for repairing damaged threads, but it works, so I’m not going to complain. Our other centerboard project was a little easier. The centerboard isn’t watertight, and since it fills with water anyway, we wanted to use it as another intake for our seawater systems. However, the only inlets for water were two tiny holes, so we took off two hatches from the centerboard and had them turned into grates for better water flow. Although it wasn’t as big as the cable spooling or the ADCP install, the centerboard project has been going on for a while, and finally wrapping it up was very satisfying. 

Finally, we can move on to our other task this week. All of the sensors mounted to the bottom of the ship are covered by ice windows to protect them from getting damaged during cruises in the arctic. These windows are big, heavy sheets of polycarbonate, and they do a fantastic job of blocking ice. However, they’re not watertight, and being flooded for years at a time means that they tend to get a little dirty. And by a little dirty, I mean covered in a thick layer of really gross mud. So we spent several days taking down every ice window and giving each of them a much needed cleaning. It wasn’t as bad as I thought it would be, especially once we appropriated the shipyard’s pressure washer for our cause. 

Those are the important things we covered this week. There’s also been a bunch of even smaller projects going on, but we’re all just waiting for the ship to float again so we can start some new fun things. That’s supposed to be this Friday, but we’ll see when we actually get to go back in the water. 

Week 3: Drydock part one

I realize that its been a while since I last posted a blog, which I’m going to blame on the fact that this is the busiest we’ve been since we finally got into drydock last week. When we got to Vigor, we spent a couple days tied up to the pier. Unfortunately, our biggest and most pressing projects needed to wait for when the ship was high and dry, so while the rest of the crew were running around all weekend, the other marine techs and I had to make do with small projects for the time being. The first thing we did was to remove the ships gravimeter for recalibration. A gravimeter is an extremely sensitive instrument that uses a temperature controlled mass held by an electromagnetic field to detect gravity anomalies. Because they’re temperature controlled, the sensor has to be constantly connected to power, which is a little tricky when you have to take it off the ship and send it across the country and back. It’s such a tricky process that we had to have a gravimeter expert come out and help us do it properly. I had never heard of a gravimeter before, let alone worked with one, so it was really cool to talk to him about the sensor and all the things it can do. Luckily, we didn’t mess anything up, and the ship should have a newly calibrated gravimeter once we get to Newport next month. 

On Monday the 17th, we were finally able to move into the drydock. Drydocking is an extremely complicated process, and it took a massive coordination between everyone involved to make it happen. However, as with all things, the yard made it look easy. As much fun as it would have been to spend all day watching them dock the ship, it just so happened to be the perfect time to get a head start on one of our big projects; specifically, the installation of a 38-kHz Acoustic Doppler Current Profiler (ADCP). An ADCP is a sensor that uses sound to measure how fast water is moving throughout the water column. One of the other marine techs, Carmen Greto, and I started installing the cable that would connect the sensor, which is at the bottom of the hull, to the computer lab, which is where all the onboard sensors are controlled from. ADCP cable is really big and stiff, and it was a pain to get installed, but we got it done. 

After the ship was high and dry, we had to put our ADCP dreams on hold and focus on our other major project: cable spooling. The ship has three different winches, as I detailed in an earlier blog. We needed to take the cable off of each one. We needed to completely replace one cable, and lube all three of them. I thought it was going to be an easy process of rolling out the cable and then put it back, but as I’ve come to learn, everything on a ship is more complicated than it seems. Spooling and unspooling cable needs to be closely monitored so the cable is under perfect conditions the whole time. One small error and it can get tangled and wrapped in itself, which no one wants to deal with. To help us, a team from Scripps came to the yard with some really cool toys. They had a shoreside cable spooler, similar to the winches onboard. Between our winch and the dock spooler, we could control the speed and tension of the cable, which let us keep the cable from turning in to a giant mess. For the entire week, we were running the cables off and on the ship. It was messy and tiring, but I learned so much about the process, and it was really cool to be able to control some of the deck machinery on the ship.

After we wrapped up (pun intended) the cable project, we focused our attention on finishing the ADCP installation. The sensor needs to be mounted a flat against the hull is possible, so I took some time making sure the housing was clean enough for it. From there, it was easy enough to hoist the sensor and bolt it in place. We had to be really careful about torquing the bolts correctly. I’ve never used a torque wrench before, so I was a little worried when I heard how important it was that the bolts were torqued, but it ended up being easier than I thought. After that, we wrangled some of the crew to help us put a protective ice window over the sensor, and it was finally installed. After it was in place, I installed a layer of foam inside the casing to prevent the sound waves coming from the sensor to reverberate and mess with the data. Despite all our hopes, it wasn’t as simple a process as we had hoped. For as easy as the physical installation was, we had to pay a price somewhere. Recall the cable that Carmen and I installed? Unfortunately, the connector that plugs into the sensor doesn’t fit in the watertight housing that lets the ship not flood. It isn’t very obvious, but this is kind of a problem. We’re still trying to figure it out, but it’s a tricky situation. 

That’s been everything keeping me busy during this first week out of the water, so I’ll wrap up this post. Hopefully by next week we’ll have found a way to keep the ship from flooding. 

Week 2: Stormy Seas

Last night, at around 10 pm, the moment the entire crew was waiting for finally happened. We finally made it to Portland and tied up to the pier at Vigor. We were so excited about this momentous occasion that the crew took bets on when we would finally tie up (our third mate proved that his skills of prediction were the best on board). Before I talk anymore about Portland, let me go back to the beginning. 

Our long journey began over a week ago on Thursday the 6th, back in Seward. All morning, the crew was buzzing around trying to make sure everything was strapped down and that all the stores were loaded. Finally, we were able to push off from the dock and get underway. It was really clear and sunny coming out of the port, and I was able to get a few good shots of Seward from the water. The conditions were so good, in fact, that me and Ethan were able to get some projects done sooner than we thought. We spent a few hours starting to install a new LAN rack in the science office and cleaning out the uncontaminated seawater system. We also had to mount some monitors in the computer lab, which isn’t a big thing on its own, but it was the first time I’ve gotten to work with a 3D printer. It was a really cool opportunity to be able to dive deeper into 3D design and manufacturing. Some of my friends have done 3D printing before, but I’ve never had the opportunity. It was really fun, and I’ve gotten to do some more printing work since, which has been very eye-opening. 

Unfortunatly, eye-opening experiences can go both ways. Two days out of Seward, we hit a big storm. We had been expecting it since we left, but it still hit us pretty hard. We were riding through 35-foot seas and 40-knot winds for three days straight. I’ve never been this far out to sea before, so even though I tried to ask around and prepare, I was not ready for just how violent the ocean was. I got thrown against bulkheads and doors a lot, and I did get a little seasick, despite how hard I tried to avoid it. Fortunately, the more experienced crew members taught us a trick to not get thrown out of your bed at night: you can stuff a safety suit or a few pillows under one side of your mattress and fold it like a taco so it will hold you. It doesnt stop the rest of the stuff in your room from getting thrown around, but at least you stay put(most of the time). 

Luckily, the weather calmed down significantly, and the last few days weren’t too bad. However, yesterday, it picked up again, and it got to the point where we couldn’t take a pilot onboard. Fortunately, we were able to navigate the bar just by following them, and we finally crossed into the Columbia river. Even though we were still on the water, there was a marked difference the moment we crossed into the river. After a week of the ship rocking and rolling harder than Gene Simmons(hi pubs), it felt strange not having to constantly stuggle to walk through the ship.

The trip down the river to Portland takes around 10 hours, so me and Ethan were able to get some more stuff ready for the shipyard. One of the ship’s main winches is getting a new cable, so we had to rotate one of the other winches into a new position so that there is enough room for the respooling job. The winches have a cool design feature that allows them to rotate so they can be used by different cranes/booms as needed, and all it takes is some elbow grease and Dawn dish soap. It wasn’t easy, but for a multi-ton hunk of steel, it moved way more smoothly than I anticipated. While doing that, I got to learn a lot about the winches, how they work, and how the ship operates them, which was really cool. It’s a side of engineering that I’ve never explored much before, and I’m excited to continue it when we replace the cable on the other winch. 

Late last night is when we finally reached the pier, and I think I’ve already covered how that went. We’ll be on the pier until Monday, which is when the ship goes into the drydock. We get to stay onboard for the drydocking, which I didn’t expect. Everyone says it’ll be pretty uneventful but I’m still excited for it. 

Page 28 of 89

Powered by WordPress & Theme by Anders Norén