The pressure housings have all been returned and I was able to verify them all! Everything went very well; only one piece will need to be sent back to be readjusted. For each adjustment that the machine shop made, I had to verify. This means that I had the part drawings and a set of calipers and I measured the parts to ensure they were within the tolerance. With the through holes, I was able to fit check by test installing the pieces, whether it be a vacuum port or a fiber optic connector.
I’ve also been continuing to work on the wire inventory. It’s amazing how many pieces of wire there can be on one box. And there are several boxes. At this point I’m about halfway done and hopefully will be finished up early next week.