Category: Woods Hole Oceanographic Institution Page 14 of 16

2 Preparation for the Atlantis/Alvin Cruise

Greetings! I’ve completed my second week aboard the R/V Atlantis and we’ve just finished the first two days of our cruise along the East Coast. My second week has consisted of continued preparation for the cruise, and I’ve also included information about my first two days at sea!

Monday I woke up early and started the day with the usual briefing meeting. It was kind of funny because the focus of much of the team’s work/discussion was fixing the Titan 4 manipulator, and I happened to have a shirt from Schilling with a diagram of the Titan on the back. One could say that I wore it for good luck. After briefing, I got to work cleaning the entire mech shop in preparation for the Titan to be taken to the shop. It was greasy, dirty work but I enjoyed it and was pleased with the result afterwards. The shop was in good shape and I worked on the cleaning the rusting tools with de-rusting chemicals and then cleaning and coating them with a protective spray. I found this interesting because I didn’t really realize that tools would corrode quickly like everything else in a marine environment. Afterwards I did some small jobs here and there to help out like inventory and storing things in the hold. I also was able to re-install the sphere cushions in Alvin and got to see what it looked like completely furbished. It looked comfy and small, but I could imagine that the view from the crystal clear acrylic portholes must be well worth it. After that, I worked with Max to mount a new 4K camera onto the forearm of the ISE manipulator. After that, 1630 came around the corner, so I stopped working and headed to dinner. The rest of the night consisted of relaxation and increased excitement about leaving port to begin the cruise.

Tuesday was pretty fun and relaxing. I started the day by gathering all of the emergency breathing masks in the sub and bringing them out for inspection and maintenance. I then watched the more senior members of the mech team figure out how to disassemble the Titan 4 manipulator (which was in the mech shop) at its elbow to figure out why it was stalling when the forearm was stalling out. I was also able to find and look at the CAD drawing of the joint disassembled and follow along with where they were at. Later, I helped mount the spare Titan 4 manipulator on the port side of Alvin which was hooked up for hydraulics testing and seemed to work well. This was good because it took the time crunch out of rebuilding the other manipulator since we now have one that works. Max and I worked on checking all of the compensation bladders in the thrusters to make sure that oil levels met our standards. We did this by poking a small rod down a hole (of known length) and stopping once we touched the bladder, then measuring the actual length it took to reach the bladder. In one of the thrusters, the oil seemed low so we decided to pump some more oil into its system. I learned that there are three different types of oils used on Alvin. Carnation oil is used for compensation in most electronics containers and cables, hydraulic fluid is used for all hydraulic purposes/compensation fluid for moveable parts, and brayco micronic is used as a fire-resistant oil. I also helped to work on some more inventory and stashing supplies in the hold. Towards the end of the work day, I helped begin maintenance on the Observation Vehicle (OV) which is a very simple ROV that is meant to only observe Alvin. I also helped untangle the tow cable that attaches to the OV. Tuesday’s work consisted of many smaller jobs since the Titan 4’s repair was of highest importance. After taking apart the joint, some of the mech team (Jefferson, Danik, and Nick) concluded by looking at the different components and seals that what happened was there was leakage in one of the elbow’s seals. To move the forearm forward and backwards, hydraulic oil is pumped through one compartment of the elbow allowing for pressure and movement in one direction, while pressure in the other compartment allows for movement in the reverse direction.  Symptoms included that when approaching the 90 degree position, the pressure in the elbow would decrease and the arm would stall. After ruling out any electrical issues (valves and the resolver) it was determined that when pressure in the elbow reached a certain threshold, fluid would leak from the one section of the elbow into the other, creating the slight loss of pressure in the elbow that was found and preventing the arm from going higher. Nick worked on replacing the faulty seals and reassembling the Titan for final testing.

Wednesday was slower than most because much of the mech leadership was out participating in a testing event for an upcoming pilot. I started the day by inspecting and wiping down the transducers mounted on Alvin, and afterwards I got training for the ‘extra guy’ position. The extra guy is in charge of prepping cameras, memory cards, blankets, towels, lunches, and CO2 scrubbers to be loaded into Alvin before launch. He works in conjunction with the pilot to make sure that Alvin’s interior is ready for the day’s dive. CO2 scrubbers are basically canisters filled with a pebble-like filter that cleans the excess CO2 out of the air. After that, I helped load the ship’s food into the freezer, cold storage, and pantry. It was an interesting and fast-paced operation because we had to load all of the frozen/cold store food before it melted/went bad. Much of the crew and the ops guys helped out to form a chain of people passing food from the freight elevator to storage. There were things ranging from kitchen supplies to meats, cheeses, vegetables, and even a large slab of chocolate. After lunch, I compiled pictures taken of the Titan 4 during disassembly and created a visual reconstruction manual to make rebuilding the Titan easier and as accurate as possible. After doing that I had free time until 1630 (when work ends), so I read through some of the Titan 4 manual and looked through some of the diagrams/drawings of the various parts/systems. I also tried to understand Alvin’s hydraulic systems more — specifically the compensation systems. I looked at some hydraulics schematics for the box filled with brayco micronic oil and containing the battery connections. I learned that in most of the compensation systems, there are 4 routes for the oil: the bladder, fill, drain, and vent. The bladder is the part that is filled with oil and as ocean pressure increases, it squeezes the bladder forcing the oil in the electronics box to match the outside pressure. The fill point is where new oil is pumped into the box while the vent is at the top where any air can escape during the filling process. The drain point can double as a fill point, but is installed to allow water (which is denser than the oil used) to sink and drain out of the box if necessary. After reading for a bit, it was time for dinner where I had some delicious scallops cooked in lemon and garlic, and relaxed for the rest of the evening.

Thursday was a bit slow, but I mainly worked on mounting the large basket to the front of Alvin. First, we bolted the frame in and then bolted in the HDPE grating that sits over the frame. Afterwards, we attached skids to the bottom of the frame and tested its weight capacity. The basket is designed to carry about 400 pounds of weight and can also be supported by two suspension cables. In addition to this, the basket can also be released from the sub should it become entangled in anything. The bracket it is mounted to is attached to the sub via two frangibolts which are bolts that can be broken if necessary. Frangibolts are a safer version of explosive bolts and function by thermally activating a certain compound that expands as it gets hot which snaps the bolts in a designated weak spot. I was also given the task of designing and making a new support jack for the basket to reduce the amount of stress the sub’s mounting brackets receive when people are standing/working on the basket. The new support jack is expected to be more stable and provide restraints to how tall it can get (in order not to damage the basket by wedging it up too far). I was given the previous support jack as a reference and began drawing out some new ideas and modifications to make including a grip centered directly over the jack as opposed to the side and a slot system that restricts the jack’s potential height to avoid basket damage.

On Friday I focused on three main things: getting hatch and window training, working on the new basket supporter I designed, and draining most of the air out of the compensation systems. I started out by getting window training from Jefferson which consisted of learning how to properly clean the acrylic windows on Alvin. The five viewports on Alvin need to be cleaned with great care because even a small scratch can turn into a stress point on the window at high pressures. I learned that to clean Alvin’s viewports you need to first wipe away any grit carefully and then use a kimwipe with a polishing agent to remove marks left on the window. After wiping it all away and inspecting the window thoroughly for scratches and dents, the windows are good to go. Alvin’s viewports are interesting themselves because they taper down into the sphere. This is because as Alvin goes deeper into the ocean, the windows are pressed into their sockets by the sea pressure making the o-rings useless at such depths. I also learned how to grease the hatch and prepare it for use. This method is also incredibly important and requires a careful greasing/inspection of the o-ring and all mating surfaces. When not in use, the surfaces are covered by protective plastic rings to avoid scratches and dents. As far as my design for the basket supporter, I was able to find the necessary parts and spent the day taking measurements and working on the basket jack. I was also able to include rubber padding on the basket grip to help preserve its paintjob and provide a little flexibility as far as exact height. For the rest of the day, I helped Jefferson and Drew remove the air bubbles from the compensation lines in the starboard manipulator and the junction box. We did this by having a vent valve open at the highest point and providing oil pressure at the bottom so that the air would find its way out of the system. Getting rid of as much air as possible from the oil systems is important because air is much more compressible than oil which causes problems when it comes to the maintaining a consistent compensation system.

Saturday was full of final preparations for the upcoming cruise. Most of the day, I worked to organize the mech shop and the Alvin hangar as well as stow all loose items. Stowing all loose items, I learned, is very important because the ship is constantly rocking and if there are rough seas, things can be thrown everywhere and even break. It was a pretty busy day, but there was a lot of excitement in the air for the cruise.

On Sunday I woke up at 0530 to see the ship leave port. It was incredible to see the ship slowly pull out of Woods Hole right as the day began. After Woods Hole fade away in the distance, I went back to sleep and later woke up to start the work day. It was a full day of work that included safety briefings, science basket preparations, and final touches on Alvin. I started the work day by helping measure the water weight of objects that would be mounted on the science basket. We did this with a fish scale and large bin of saltwater and the expedition leader used the data figure out what kind of adjustments we should make to Alvin to accommodate the weight. I also worked on mounting various tools onto the basket that the science team brought which included ore samplers, vacuum pumps, and collection cases. I found it incredibly interesting that all of this equipment had to be made in a way that interfaced well with the manipulators. Later, I bolted on Alvin’s skins which are thin pieces of plastic/fiberglass that make up its outer shell. This was the first time I had seen Alvin fully equipped and ready to dive. I also worked on helping Drew (an electrical technician) clear more air out of the compensation systems and also learned through experience that clearing air out of all the oil systems is a very time consuming task. The process basically consists of raising the various oil-filled cables so that the air bubbles will float to the top and then opening a vent to allow the air to escape while pumping in new oil to displace it. We also had our safety briefing where we learned protocols and stations for ship emergencies. One of the things we did was try on immersion suits (gumby suits) that each person had to protect them from the harsh ocean environment if we had to abandon ship. These suits were very bulky, but were very snug and warm, which I suppose are good things when lost at sea. Overall, we ended the work day around 2130 which was my longest day so far. It was understandable of course because we needed to make sure everything was ready for the diving to begin in the morning.

Since Monday was a dive day, we got to work at 0530 in preparation for our first dive at 0800. We all took part in the pre-dive checks which included cleaning the windows, hatch, testing components, and loading the sub with its necessary in-hull equipment/consumables. As part of the pre-dive I cleaned all of the windows with window polish, bolted on the remaining skins and helped load equipment like sphere blankets and food into the sub. When we were ready to launch, I got to operate the sled mechanism which rolled Alvin out on tracks leading to the A-frame. When that was finished I dawned a safety helmet and a lifejacket to help with the final preparations. I watched as others loaded weights onto the sides using wheel-mounted winches that helped them lift the weights under that attachment points. These weights are used to get Alvin to sink down and are dropped when the pilot wants to return to the surface. Right before diving, someone must pull six safety pins and show them to the pilot in order to confirm that the weights are primed for release. After wheeling Alvin out all the way, I watched as the A-frame was lowered and the main line guided down to the T piece on Alvin. After all lines were attached, Alvin was lowered into the water with Max/Todd (the swimmers). I watched as the swimmers finished their work in the water and made their way to the small boat that would bring them back to the Atlantis. Then Alvin slowly lowered beneath the waves and began its dive. While waiting for Alvin to finish its dive, Nick and I cleaned the hangar out as well as the mech shop then had some lunch. We also visited the top deck where someone is always monitoring the position and keeping in contact with Alvin. The top deck is at the same level as the bridge, so there was an amazing view of the horizon and I could see seemingly forever. A couple of hours later, the Alvin dive was cut short due to lack of good visibility and strong currents that the sub had to contend with. Per protocol, Alvin surfaced off the side of Atlantis’ bow where swimmers went out and attached a tow line. The Atlantis then moved forward past Alvin so that Alvin would end up behind Atlantis. After the sub was reeled in enough, swimmers attached the main cable and other necessary lines to the sub and the A-frame raised it out of the water and placed it onto the sled. I helped clean off Alvin and moved it back into the hangar where we proceeded to complete a post-dive check. This post dive check consisted of re-adjusting anything that might have changed during the dive and checking the hydraulic/compensation lines for leaks. I helped unload some of the equipment from the basket that the scientists needed and helped test the torque on the frangibolts around the sub. I also helped unload the used equipment from inside Alvin and learned more about testing/maintaining the hydraulics systems after each dive.

Thanks for reading and joining me in my adventure aboard the R/V Atlantis with the Alvin Group! I look forward to seeing many more dives and learning as much as I can about the hard work put into making Alvin operational.

Week 2: Leaving Land

Well, we leave for sea tomorrow, and its as if the ship has suddenly sprung to life.  In the past few days, one of our labs has been taken over by boxes, their numbers counting into the 400’s.  I was impressed at the number of boxes all the scientists had, until it was pointed out to me that that’s all from one lab, and that they only represented 4 out of the 24 scientists on the cruise.  But it is so nice to have all these new faces running around, everyone is moved onto the ship now (because the Falmouth road race is tomorrow, so people needed to come on at least 5 hours before we left).  I spoke to some of them at dinner, and it seems like they have a wide range of interests, which should be really fun.  I hope that I am able to learn more about each of their areas. 

 

My direct boss, Drew, just moved onto the ship a few days ago, so we are now able to go through the rest of the 3 month/25-30 dive check list that we had been holding off on.  Todd took little Nick and me on a shopping trip and then out to dinner (with Drew) which was a really nice bonding experience.  I had at first been really intimidated by Todd’s demeanor, but as I’ve continued working with him, I realize that his comments are a sign that he cares.

 

I have my alarm set for early because I want to be sure to see us off from shore (I’ll post pictures of that below).  I have had so many amazing experiences already, but I feel like the real adventure is about to start!

Week 1- On board R/V Atlantis

 

For the first time last night, after almost a week of being, I actually felt like a part of the Alvin Ops group.  The past week has been a whirlwind of getting settled on the ship and finding my way around WHOI. Ship life is so much more comfortable than I could have ever imagined, I have become so accustomed to the ship that walking around feels almost second nature. The food on here is so good!

 

Yesterday was the Science Stroll, a day long event where all the departments of WHOI bring out their work to show to thousands of community members who cycle through the docks and go to the different booths.  Many of the people who came did so simply for the opportunity to see Alvin up close.  We had to set Alvin up in the morning for public viewing, but we had the rest of the day off.   As we began setting up, all of the interns were given ALVIN OPS t-shirts, which I’d been coveting since I first saw someone wearing them.  Then, once we were released for the day, I hung around and watched each of the more experienced Alvin Ops group workers present on the history and abilities of the sub.  After a couple of hours of watching them and Vera White-ing,  I volunteered to give a group a tour, and that felt so cool.  After only being onboard for 5 days, it felt great that I knew enough about it to give a 4 minute presentation and then

answer questions. 

 

Finally, the day concluded with a bbq for the Alvin Ops group and some of the crew.

It was such a nice way to get to know my coworkers and to hear stories about their past.  But the best part was hearing stories about what Alvin used to be like from the people who were actually there.  One of the people who we were talking to pulled out a picture of the wreck of the titanic and pointed at the massive pile of sand in front of the bow and

said, “I ate my lunch right there”, as if it were the most casual thing ever.  He then went on to describe what it was like to drive the sub up to the main staircase of the Titanic as if it were a regular dive.  I couldn’t believe I was talking to one of the few people to lay eyes on the titanic in the past 100 years!

 

Finally, the night concluded with a big handshake from Bruce, the guy in charge of Alvin, as he said ”Welcome to the team!”

 

I’m so excited to see what the rest of this trip holds; I have such a good feeling that its going to be amazing!

 

1 Aboard the R/V Atlantis with the Alvin Group

Hello everyone! I have just completed my first week working as an intern at WHOI with the Alvin Ops Group. I’ve had a blast so far and I can’t wait to see what comes next!

Monday, August 6 was the start of my first internship! After flying to Boston from Sacramento, I arrived at 0620 in the morning and boarded a bus to Woods Hole. As I got off the bus, I saw some white-green buildings towering over the other buildings in town near the water. However as I moved to one side, I soon realized that the “buildings” were actually the superstructure of the R/V Atlantis. Even after reading about its size, I was not prepared for how big the Atlantis was. This would be my home for a month. After meeting with Bruce (my supervisor) and Peter, I was given a quick tour of Woods Hole’s main facilities and the Atlantis. Soon after walking on deck, I peered into the hangar and saw the one and only Alvin. I couldn’t believe that I was really on this internship, working and living aboard the Atlantis with Alvin. It’s still hard for me to take in. After setting my stuff down, I went right to work and met the other new workers/interns named Max, Nick, and Jacob. I was placed on the mechanical team and would be looking forward to working on mechanical issues with Alvin. My first day was filled with new introductions and tours. I got many tours of Alvin’s features, such as its large 60 cell batteries, its pressure compensation systems, and its Titan 4 robotic arm. I also got to meet and socialize with much of the crew, and they were very kind and inspiring in their love for the Atlantis/Alvin. The meals were delicious and proved that the cook is the most important person on the ship. After dinner, I explored the Atlantis some more and looked forward to my next day.

On Tuesday, breakfast was at 0730 (as with all non-dive work days) and it was delicious. I continued to be pleasantly surprised by the quality of the food on the ship. Afterwards, I started working at 0800 by going to the briefing meeting that the Alvin ops group was having in order to figure out what needed to be done in preparation for the cruise. Aside from helping people carry things, I was given the task of doing inventory/inspecting the emergency food/water rations for Alvin and cleaning the sphere blankets as well as taking out the sphere cushions for inspection. Jefferson, the head mechanic, was very friendly and taught me about how the Alvin group manages the maintenance of Alvin. There are lists that reference individual maintenance procedures (MPs) by using a number system. Maintenance is done pre-dive, post-dive, pre-cruise, post-cruise, every 30 days or every 20 dives, every 3 months, every 6 months, every year, and every 10 years (If I remember all of these correctly). I also learned about all of the paperwork that must be done with the Navy in order to clear someone for working on Scope of Certification (SOC) equipment/supplies. These are very controlled because SOC stuff is considered a matter of safety for the personnel within Alvin. I also helped take inventory of the new mech supplies we ordered and stored them all in the hold. From all these activities, I’ve learned that there is lots of time/care put into preparing Alvin for the cruise and much of the work is paperwork and certifications that are run through the Navy. Safety is of utmost importance. Dinner was delicious as we had some sort of barbecued brisket with spicy onions on top and barbecue sauce. It was perfect and went well with the fresh bread/salad. The day was really tiring, but I definitely learned a lot about the ops team’s organization methods.

On Wednesday, I did many different things that were all pretty fun. I got to go inside Alvin for the first time and got a safety briefing as well. It was very small and darker than I expected. The walls were also lined with safety equipment, air tanks, and tons of controls. We also began to work on attaching the two robotic arms. The port arm is a Schilling Titan 4 and the starboard arm is a Canadian ISE manipulator. This was very fun and I was surprised at how heavy the Titan was. We connected it to a pulley system which took most of the weight and we guided it into the shoulder bracket where some of us mounted it via many heavy bolts. I also learned about the O-ring organization system which is very strict because the O-rings stop water from entering the sub’s main sphere. These O-rings must be filed and tracked individually as the Navy can audit WHOI and check to see that their O-rings (SOC A level) are under proper control.

On Thursday, we focused on hooking up the hydraulics for the two manipulators and I got to learn a lot about how hydraulics systems work and what connectors are used. After observing the two more senior interns connect the hydraulics systems up, I was tasked with organizing the hoses so they would not get snagged on debris under the water. Afterwards, we tested the two arms which resulted in the comp (pressure compensator) line snapping out of its connector and squirting oil. The arm still worked and after testing, Nick (older intern) and I worked to fix the connector and reconnect everything. The other problem that we noticed with the Titan arm during testing was that it was not able to raise itself past 90 degrees and points straight out. We thought that maybe it was a leak in one of the O-ring/screws mounted at the top of the elbow or maybe it was a leaky line.

On Friday, we worked to fix the issue of the faulty Titan 4. I did not work on it much because I had many other tasks to attend to, but I kept a close eye to see what was going on. Apparently it was not a faulty line. The team began component testing and running down the line of things that could have gone wrong while testing in between to verify. We thought it was maybe a failed servo valve, but upon changing it out, we learned that was not the case. My work today mainly focused on prepping and mounting the giant titanium T that Alvin is lowered into the water with. It consists of two titanium cylinders welded together perpendicular to one another to form a T and attached at its base to Alvin’s top-center. I got the CAD image of the assembly and disassembled it. I then cleaned the two outer plates, cleaned the bolts, primed the bolts, and after a while mounted the T on Alvin. I started by greasing the center pin and then putting it through the T and its bracket. I then bolted the side plates on and used some Loctite as well.

Saturday was not a standard work day, but we still did many cool things. We started out by prepping Alvin for the public science event/showcase, and I was in charge of wiping Alvin down to make sure it was clean for everyone to see. We then bolted the basket on and put some tools on it for the showcase. Afterwards, Alvin was moved out of the hangar onto the deck and we finished setting it all up. Then Todd (the expedition leader) gave us interns each our own Alvin Ops Group shirts. I was so proud at that moment to have an actual Alvin shirt for cruise. I wore it for the rest of the day. Afterwards, Nick and I went to get some food for the cookout that would take place after the science event. We did not have to be at the science event since only the more senior members were giving tours and answering questions to guests. After the event and at the cookout, I met many working/retired employees of WHOI who had worked with Alvin, Atlantis, Jason, and Jason Jr. I was also able to talk to some of the crew of the Atlantis and get to know them more, and I was able to talk for a long time with Will Sellers who was an Alvin pilot since the Lulu days and even piloted Alvin during the exploration of the Titanic. I was also talking with Bruce, and he said to think about what it is that I want to get out of the internship and to remember it. I don’t think I could name any one thing from this internship that I want because there are so many things that I’ve learned and experienced here that I love. Before the internship, I think I would have said that I wanted work experience, but now that I’ve lived among the Atlantis/Alvin crew, I grown into thinking that I would love to make a career out of this and have also enjoyed the friendships I’ve made in just this week. All in all, I’ve been having an incredible time. I look forward with eagerness at the next week of preparation for our cruise with Alvin!

Anticipating Alvin

Hi Everyone!

I can’t believe that in 3 days I will be heading to Woods Hole and will move onto R/V Atlantis.  The purpose of this voyage is to look for vulnerable deep-sea communities between Virginia and Georgia in advance of future hydrocarbon mining using HOV Alvin.  I will be working in the electronics shop doing pre- and post-dive checks of the sub.  

I’m currently a rising senior at the University of Rochester studying electrical and computer engineering, and I’ve spent my summer working for a defense contractor that makes computer boards for various military and civilian companies.  I spent my time creating a new testing plan for a new board that we were making, as well as writing a white paper on 1553 Communication.

After I heard about what the mission would be, I went to the Natural History Museum, and immediately started practing driving the sub that they have in their new Unseen Ocean Exhibit just in case I am called upon to drive Alvin. 

I’m really looking forward to going to Woods Hole and absorbing all the information that I can.  There is so much left to explore of the ocean, and I’m so excited to help make a dent in that.

0 Pre-Internship Post: R/V Atlantis

Hello everyone! My name is Nick Ellis, and I’m a rising sophomore at Santa Clara University studying mechanical engineering. In high school, I joined Jesuit Robotics and competed in the MATE International ROV Competition where I developed a special interest in underwater robotics. In the next couple of weeks I will begin my internship working aboard the R/V Atlantis with the HOV Alvin group. I am ecstatic at having this opportunity to experience firsthand what it’s like to work as a marine technician, and I cannot wait to begin work with these two historical research vessels. Throughout the internship, I’ll be posting about what I’ve learned and my new experiences at sea. Anchors aweigh!

Week Four: Countdown to Reykjavik

0800 Local Time

Goðan dag!

Today is our last day at sea on the Iceland transit, hence my Icelandic greeting. We were originally meant to be in Reykjavik yesterday afternoon, but two days of really rough seas set us back.

Despite the weather and sea conditions, we did still manage to deploy 3 wave buoys as well as a glider over the side. Tina was our lone scientist on board and was fun to work with to get these things deployed. The round, orange, surface float is designed so that the drifting buoy will move on the surface with the currents, helped along by an attached, underwater drogue. A variety of sensors are also enclosed in the float, and an onboard antenna transmits the sensor data and buoy position. I have no doubt that those little surface buoys picked up some interesting climate and weather data.

The glider was the last to get deployed this week and was a challenging operation as the weather had once again turned against us. The Bosun thought it would be safest to attach a tag line to one of the starboard side winches and jib the glider out as far away from the ship as possible. Even then, it still drifted dangerously close to the hull and the Chief Mate had to engage the bow thruster to move us away from it. The danger was that the sensors on the nose of the glider are incredibly sensitive and could not come in contact with the vessel at all. Even rubbing against a shirt sleeve could destroy them.

This past week also provided a lot of opportunities for troubleshooting instrumentation and working on new projects. I think Amy and I totaled a solid work day worth of time trying to troubleshoot connectivity issues with the EM710 multibeam (offshore, shallow water unit). We inspected the transceiver unit and ethernet connections, swapped TX boards, bypassed the remote switch (which also seemed to have issues), and even pulled out the remote switch to inspect the connections inside. We got some good transmissions for a time, but it is not consistent, which remains a real head scratcher! Once we were in deep enough waters, we tried booting up the EM122 multibeam, and then found out that the database for it was missing. So that was another day of problem solving and configuration on that particular unit that, thankfully, ended in success. Go, Amy!

One project that I was excited to undertake was editing and reprinting a cylindrical coupler for the electrical slip ring on the CTD winch. The first print, unfortunately, did not quite fit the bolt pattern required and so I took some additional measurements and created a new, printable file in Autodesk Inventor. Thankfully, I worked with that program at Cal Maritime, but had yet to facilitate an actual print job. The ship has a LulzBot 3D printer, and I downloaded the printer software and slicing program for it. We did a test run of 3mm each of the top and bottom of the piece to check alignment and then, just 12 hours later, the part was successfully printed and is a good fit!

Now, just 4 hours out from Reykjavik, I am a bit amazed at just how quickly this month has passed by. I am so grateful to Amy, Joe, and Cris for their guidance and the multitude of learning opportunities and hands-on projects these past few weeks on the R/V Armstrong. They work really hard and need to be savvy with so many different systems and skillsets. Their services are vital, and I hope they know that they are appreciated!

Due to our delayed schedule, I will be staying in Reykjavik tonight and flying to San Diego tomorrow to board the R/V Roger Revelle at Scripps. Stay tuned for more as I head back to the West Coast!

– Emily

Week Three: Transit to Iceland

May 6, 2018

1730 local time

Greetings!

I am writing from our current position off the coast of Nova Scotia on our way to Iceland. We have a few stops planned during the 9-day transit in order to deploy a couple of gliders and a massive buoy, which is currently taking up quite a bit of prime real estate out on the fantail.

Getting ready for this cruise certainly made for a very busy week for everyone! The science teams from the previous cruise were all packed up and off the ship by Monday morning after a fun sendoff party at the local eatery in Woods Hole. We then spent a solid day cleaning up the lab and berthing spaces to make way for the new cruise, and the rest of the week was dedicated to maintenance projects and new installations.

One of the new additions is the work boat, which was left behind on the dock during the last cruise. Since it was laid up for a few weeks, the 3rd Mate was tasked with refueling and running the engines. I was invited along for the journey and even trusted to drive for a while around the harbor. As you can see by the lack of wake, I took it easy out there, unlike the 3rd Mate who really gunned it and managed to get us impressively wet out there. All around, quite a fun experience.

I thought the ship was impressively kitted out when I arrived, but there is new, shiny tech installed all over the place for this cruise. Earlier in the week, I tested my hardware skills by mounting and connecting 4 new monitors around the lab space as well as a new deck box for the expendable bathythermograph (XBT) probe. After being elbow deep in data cables in the main lab rack for over an hour, I actually got a chance to go out to the transom and use the XBT hand launcher. Though the look and feel of it suggests that the launcher could pack a punch, it is really just a means of keeping the probe cannister steady. Once the pin is released on the underside, the probe just sort of plops out undramatically and makes its long journey down as the conductor cables pay out smoothly to 1800 meters.

The start of a new cruise has also meant that I am finally able to work with Amy, the marine technician, on creating a new cruise data log and initializing the underway instrumentation, flow-thru systems, and echo sounders. I am finding it really beneficial to be able to get my hands on the control units, pumps, valves, and various software systems for the instruments. However, now that we are in Canadian waters, we are actually not allowed to record any data so I now have some experience in how to stop recording as well.

Another week at sea also means another safety drill. Instead of fire & emergency, the Chief Mate chose to have an informational session on hypothermia and on rescue procedures for pulling someone out of the water. Both the ship and work boat now have these scramble-nets to create a cradle and either roll someone up out of the water or have them scramble up to the deck. We watched a few videos and also demonstrated deploying the net on deck.

This week really flew by, and I am glad I got to spend a few days of it in Woods Hole. It is a really nice town, and I felt so at home there so quickly. It was great meeting people at WHOI, and I am excited to come back in October for the INMARTECH conference. My next update will be coming from Reykjavik!

– Emily

Week Two: A Return to the Day Shift

2330 local time

Hiya!

Another Sunday has arrived, bringing with it the end of this first cruise. Over the last two weeks I have lead over 85 CTD deployment and recoveries and the nutrient sample vials total out at 997! Some days it has been difficult to adjust to the 0000-1200 work schedule, but I was put on a great team and we powered through the early morning shifts and crazy water sampling transects together. 

As far as science operations go, this one seemed incredibly busy and ambitious. We had 175 CTD casts and water sampling for gases, DIC, chlorophyll, nutrients, as well as grazing experiments, two incubation chambers, VPR and MOCNESS tows, and lots of at-sea analysis going 24/7. The lab spaces are always hotbeds of activity and it is strange now to see instruments and sampling stations being broken down. It is going to feel really empty in here tonight once everything is gone.

This past week has gone by pretty quickly, likely owed to it being rather eventful. In addition to normal science operations, there was a rupture in the FW cooling water line to a forward SW supply pump, which created a lot of water that had to be pumped through a garden hose running through the length of the ship to the aft OWS system. We also had an early morning rendezvous with the M/V Warren Jr. to pick up a replacement part for the towed VPR. The 2nd Mate took the fast rescue boat over with the documentary cameraman on board. Since this happened shortly after sunrise, the watch team could observe the boat being lowered and recovered from out on the deck.

I also got to expand my deck experience to include operating the main 30,000 lb. hydraulically driven A-frame controls to retrieve the MOCNESS and deploy the VPR. Moving the directional lever outboard or inboard with over 3,000 psi of accumulator pressure provides an interesting resistive feeling I haven’t experienced before. Though the control is a simple out or in, you also need to watch your speed and pressure, as well as the potential entanglement of the winch blocks while simultaneously watching and listening to the Bosun for instruction and keeping an eye out for safety hazards.

I am curious to see what the next few days are going to be like at the R/V Armstrong as one cruise offloads and another moves on. When I arrived two weeks ago, the science vans and large equipment were already onboard, so I missed that particular operation. In addition to helping with the transition this week while the ship is pier-side, I am also looking forward to spending more time on marine technician projects. This should also be my focus during the two-week transit to Iceland. There will be fewer science missions so that should, potentially, free me up to spend more time on the various shipboard instrumentation and networks with Amy, my new mentor. I am lucky to have the chance to learn from her as she has a wealth of knowledge and experience.

Tonight, I am going to try to go to bed at a more usual hour and wake up for the day shift to try to readjust to a new schedule. My next update will be a couple of days in on our transit to Iceland.

More soon!

– Emily

Week One: Rough Seas

0330 Local Time

Hi there!

I’ve spent the last week on board the R/V Neil Armstrong on my first ever ocean-going research vessel. I am starry-eyed over the variety of instrumentation and technology that the ship is kitted out with. It’s so cool! This includes, of course, the 3 separate satellite ship-to-shore connections allowing me to be online and sharing my experiences with you.

The current mission objective is to complete 12 cross-shelf section transects of the Middle Atlantic Bight, which is an area of diverse productivity well known to local fisheries. Our first few days were dominated by heavy seas, which made for some difficult and uncomfortable working conditions for a majority of the science team (ie. wide-scale, debilitating seasickness). I was placed on the 0000 – 1200 hydrology watch with some truly delightful people and am gaining some good insight into field sampling methodologies and the herculean effort required to complete a study of this magnitude. The amount of water we constantly collect and filter through is on a scale I was previously unfamiliar with. It has been a week, and for nutrients alone, I count 400 individual sample vials now frozen and waiting for analysis.

My role as a nutrient sample collector has also given me the time during watch to get familiar with the deployment and recovery procedures for the CTD carousel. For our safety, we communicate with both the bridge and the winch operator during casts. The combined weight of the CTD, Niskin rosette, Video Plankton Recorder (VPR), and the frame is significant and so following safety procedures is paramount!

An added bonus of being on the 0000 – 1200 team is watching the sun rise out at sea, which is always a beautiful and welcomed sight.

When I am not working with the science team or sleeping, I am shadowing the two Shipboard Scientific Services Group (SSSG) technicians – Cris and Joe – to get a foundational understanding of their job duties. So far, I’d say this has been an incredibly eventful week and I have already absorbed so much. I look forward to more and will be back next Sunday with another update.

– Emily

 

Page 14 of 16

Powered by WordPress & Theme by Anders Norén